Laserfiche WebLink
<br />.. <br /> <br />.. <br /> <br />. <br /> <br />. <br /> <br />. Six hard copies and one digital copy (in MSWord and Adobe Acrobat PDF format) of a <br />draft Technical Memorandum will be provided to the State. This draft Technical <br />Memorandum will be the basis for identifYing data gaps and developing locations for the <br />field data collection program described in Tasks 33. <br /> <br />. The draft Technical Memorandum will be updated into a final Technical Memorandum <br />after adding new aquifer configuration information obtained under Tasks 35 and 36, and <br />addressing State comments on the draft Technical Memorandum. <br /> <br />. The Technical Memorandum will be provided in draft final form to the State for review <br />and comment. The Consultant will incorporate the comments and recommendations from <br />the State, and provide a final Phase 1 Denver Basin Region Aquifer Configuration <br />Report. Six hard copies and one digital copy in MSWord and Adobe Acrobat PDF format <br />will be provided to the State. <br /> <br />Task 43.3 Phase 1 Lower South Platte Region Aquifer Property Technical <br />Memorandum <br /> <br />. The Consultant will develop a submittal of approximately 10-15 pages (with additional <br />pages for maps and appendices), consisting of the historic data on aquifer properties and <br />their analysis, as described in Tasks 32 and 43.1. The Technical Memorandum will <br />include the following: <br /> <br />- a discussion of the data sources, analysis methods, and results <br /> <br />- a summary of the HydroBase-compatible database fields, structure and contents <br /> <br />an electronic HydroBase-compatible version of the aquifer property database <br /> <br />- aquifer property maps <br /> <br />· Six hard copies and one digital copy (in MSWord and Adobe Acrobat PDF format) of a <br />draft Technical Memorandum will be provided to the State. This draft Technical <br />Memorandum will be the basis for identifYing data gaps and developing locations for the <br />field data collection program described in Tasks 33. <br /> <br />. The draft Technical Memorandum will be updated into a final Technical Memorandum <br />after adding new aquifer configuration information obtained under Task 35, and <br />addressing State comments on the draft Technical Memoran~um. <br /> <br />· The Technical Memorandum will be provided in draft final form to the State for review <br />and comment. The Consultant will incorporate the comments and recommendations from <br />the State, and provide a final Phase 1 Lower South Platte Region Aquifer Configuration <br />Report. Six hard copies and one digital copy in MSWord and Adobe Acrobat PDF format <br />will be provided to the State. <br /> <br />SPDSS Groundwater SOW, Phase 1 <br /> <br />Page 15 <br />