Laserfiche WebLink
EXHIBIT E <br />Task Schedule <br />SPDSS Groundwater Component - Phase 2 <br />October 30, 2003 <br />Task Task <br />Task Description Start� End <br />33 Workplan Revision and Update O1/03/04 5/03/04 <br />35 Construction and Testing of Alluvial Wells 3/O1/04 11/15/04 <br />36 Construction and Testing of Bedrock Wells 3/O1/04 11/15/04 <br />37 Aquifer Pumping Tests O1/03/04 12/28/04 <br />39 Collection of Water Level Measurements O1/03/04 12/28/04 <br />40 Evaluate Abandoned Wells for Conversion O1/03/04 2/28/OS <br />42 Aquifer Configuration Data Analysis O1/03/04 2/28/OS <br />43 Aquifer Property Data Analysis Ol/03/04 2/28/OS <br />44 Aquifer Water Level Data Analysis O1/03/04 2/28/OS <br />50 Development of Data Centered Approach O1/15/04 7/30/04 <br />51 Phase 2 Management O1/03/04 2/28/OS <br />Notes: (1) Starting dates for all Tasks assume Phase 2 contract execution by U1/U3/U4. <br />(2) Ending dates for Tasks 35 and 36 are dependent on field and weather conditions and <br />assume site access can be obtained within 30 days. <br />SPDSS Groundwater SOW, Phase 2 34 <br />