Laserfiche WebLink
review all data and include data that the Consultant determines to be beneficial for the <br />SPDSS. These data will be converted to an electronic format appropriate for incorporation <br />into HydroBase. Data collected under Tasks 35, 36, 37, 39 and 40 during Phase 2 also will be <br />converted to an electronic format appropriate for incorporation into HydroBase. <br />• The database developed under Phase 1 will be updated with Phase 2 field data. The updated <br />database will be summarized for descriptive purposes, including the database fields, number <br />of entries in each Field by aquifer, and sources of data. <br />• Digital contour or point plot maps developed under Phase 1 will be updated with Phase 2 data. <br />This includes maps of (a) water level elevations for the current year and (b) hydrographs. The <br />water level elevation maps will include the location of Phase 2 data used in the contouring. <br />Contour maps will be prepared for those data elements with sufficient data to reliably develop <br />contours, while sparse or highly variable data will be presented on point plot maps. <br />• The maps will be evaluated and revised based on the presence of outliers, comparison to <br />existing contour maps, and Consultant's professional judgment. <br />Deliverables: <br />Task 44.2 Phase 2 Denver Basin Region Aquifer Water Level Technical Memorandum <br />• The Consultant will develop a submittal of up to 10 pages (with additional pages for maps and <br />appendices), consisting of the historic data on aquifer water levels and their analysis, as <br />described in Task 44.1. This Technical Memorandum will focus on information collected <br />during Phase 2 and will be an update to the Task 44.2 Phase 1 Technical Memorandum. <br />• The Technical Memorandum will include the following: <br />- a discussion of the Phase 2 data sources, analysis methods, and results <br />- a summary of the HydroBase-compatible database fields, structure and contents <br />- an electronic HydroBase-compatible version of the aquifer water level database <br />- aquifer water level maps that are representative of non-pumping conditions for the <br />calendar year for the alluvial aquifer and for each bedrock aquifer, presented in l lxl7 <br />inch hardcopy format <br />- hydrographs developed for the 40 wells that were presented in the Phase 1 Task 44.2 <br />Technical Memorandum will be updated with Phase 2 data, presented in 8.Sx11 inch <br />hardcopy format <br />The Consultant will provide six hard copies and one digital copy (in MSWord and Adobe <br />Acrobat PDF format) of the Draft Technical Memorandum for the State's review. The <br />Consultant will incorporate the State's comments and recommendations and provide a Final <br />Technical Memorandum. Six hard copies and one digital copy in MSWord and Adobe <br />Acrobat PDF format of the Final Technical Memorandum will be provided. <br />SPDSS Groundwater SOW, Phase 2 23 <br />