Laserfiche WebLink
<br />;:::"~I <br /> <br />,~~t;'. <br /> <br />,., <br /> <br />'",'. <br /> <br />AGENCY NAME: Waler Conservation Board <br /> <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: 0 103 '--I <br /> <br />$100,000 <br /> <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this /7 ,day of A-bv,...-.6-..- 1997, by <br />and between the State of Colorado for the use and benefit of the Department of Natural <br />Resources, Colorado Water Conservation Board (CWCB), hereinafter referred to as the STATE, <br />and The Decker Lateral Company, a Colorado nonprofit corporation, 30896 WCR 57, Gill, CO <br />80624, hereinafter referred to as the BORROWER and/or CONTRACTOR, <br /> <br />FACTUAL RECITALS <br /> <br />1, Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered bCllance thereof remains available for payment in <br />Fund Number 424, Organization YYYY, Appropriation SPL, GBL 0757 Program WTRC, <br />Object Code 5120, Reporting Category: 3757, Contract Encumbrance Number C153757. <br /> <br />2, Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies, <br /> <br />3, Pursuant to the provisions of SS 37-60-119 and 37-60-120, 15 C,RS. (1990 and Supp, 1996) <br />the STATE is authorized to loan money for the construction of water projects for the benefit of <br />the people of the STATE, provided that the borrower assures repayment of that money, . <br /> <br />4. Section 37-60-122,7, C,RS. (Supp, 1996) authorizes the STATE to make loans of up to <br />$100,000 from the Small Project Loan Account of the Construction Fund without prior <br />approval from the General Assembly if the STATE determines that delay would result in undue <br />hardship on the borrower. <br /> <br />5, The BORROWER is a duly constituted Colorado nonprofit corporation located in Weld County, <br />State of Colorado. <br /> <br />6. The BORROWER has applied to the STATE for a loan to be used for financing the rehabilitation <br />of its ditch, hereinafter referred to as PROJECT, at an estimated total cost of $140,000, <br /> <br />7. The STATE has reviewed a feasibility report prepared by the U,S, Natural Resources <br />Conservation Service and the CWCB staff, which is incorporated herein by reference, and, <br />based upon this feasibility report, the STAT'" determined the PROJECT to be technically and <br />financially feasible, <br /> <br />8. This loan qualifies as a Small Project Loan in accordance with S 37-60-122,7, C.R.S, (Supp, <br />1996), because the amount of the loan does not exceed $100,000 and the BORROWER will <br />suffer undue hardship if the PROJECT is not completed prior to the 1998 irrigation season due <br />to water losses caused by the poor condition of the BORROWER'S ditch. <br /> <br />9. At its September 9, 1996 meeting, the CWCB found that delay in completion of the PROJECT <br />would cause undue hardship for the BORROWER'S stockholders, and approved a loan from the <br /> <br />The Decker Lateral Company <br /> <br />Page 1 of 14 <br /> <br />Loan Contract <br />