Laserfiche WebLink
<br />i <br />I <br />I <br /> <br />. _.... _ . __ _.n '" ~'''~, <br />li1/PB <br />Bauer No. 1 <br />""- Reservoir Dam <br />~ '; <br /> <br />~- <br /> <br />m.i',\KI~H.,'.j r OK ,\l,l:NCY ,~U.\lBl:R <br />34-04-00 <br /> <br />AMENDHENT #1 <br /> <br /> <br />PROJECT . <br />CONTRACT flQ.- . q 13&?S <br /> <br />THIS CONTRACT, made Ihis /q#dayof 0-.?d~ 19 ~. by and between the <br />Slale of Colorado (or the u!oe and benefit of the Department of 0' Natural Resources <br />(Colorado Water conservation Board), <br />hereinaher It'felTed 10 as the Slale. :Ind'2 The Bauer Lakes Water Company I <br />11747 Co. Rd. 41, Hancos, CO 81328, <br />ht'reinafler referred 10 as the contractur !Contractor. <br /> <br />Reduce Loan Amount $19,148.78 <br /> <br />WHEREAS. authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />availllble and a sufficient unencumbered balance thereof remains available for payment in Fund ~umher 4008 <br />'G/l Account Number 5409X. Conlract Encumbrance Numbe&-153564; and <br />ABL Account No. 14090, Org. Init 77-77-777, <br />WHEREAS. re4uircd appruv:d. c1earam:e and coordinaliun has been accomplished (rom and wilh appropriale <br />agencics: and <br /> <br />WHEREAS. pursuant to the provisions of 37;60-119 and <br />37-60-120. Colorado Revised Statutes. the State is authorized <br />to loan money for the construction of water p!ojects for the <br />benefit of the people of the State provided that the Contractor <br />.assures repayment of that money; and <br /> <br />WHEREAS. the Contractor is a water company in the State of <br />Colorado and it wished to improve the facilities of the Bauer <br />No.1 Reservoir Dam. hereinafter sometimes called the project. <br />for the benefit of the shareholders of the water company in <br />Montezuma County. Colorado. at an estimated cost of Two Hundred <br />Thousand Dollars ($200,000); and <br /> <br />WHEREAS. the State and the Contractor entered into a <br />contract dated June 28. 1989. Contract Encumbrance Number <br />C-153564, Routing Number 89600 (hereinafter tbe 'Original <br />Contract"): and <br /> <br />WHEREAS. the Original Contract authorized the State to loan <br />$100.000 to the Contractor for the rehabilitation of the Bauer <br />No. 1 Reservoir Dam: and <br /> <br />WHEREAS. construction of the project has been completed to <br />the satisfaction of the State and the Contractor; and <br /> <br />WHEREAS, the State actually only advanced a total of <br />Ninety-Two Thousand Eight Hundred Fifty-One Dol1ars and <br />Twenty-Two Cents ($92,851.22) to tbe Contractor for the <br />construction of this project and preparation of feasibility <br />report: and <br /> <br />WHEREAS. the Contractor obtained unexpected supplemental <br />grant funds from the U.S. Department of Agriculture, Soil <br />Conservation Service. to pay part of the cost for the <br />construction of this project after the State had already <br />advanced its Ninety;'l'wo 'l'housand Eight Hundred Fifty-One <br />Dollars and Twenty-Two Cents ($92,851.22); and <br /> <br />WHEREAS. as a result of receiving the unexpected grant <br />funds from the Soil Conservation Service. the Contractor did <br />not need all of the Ninety-Two Thousand Eight Hundred Fifty-One <br />Dollars and Twenty-Two Cents ($92.851.22) which the State bad <br />loaned for the project; and <br /> <br />WHEREAS. the Contractor sent a check for Twelve Thousand <br />Dollar$ ($12,000) to the State for the purpose of reducing the <br />loan amount on the project. <br /> <br />3850E* <br /> <br />195-5}()'lo1014 <br /> <br />5 <br />Pag.e I of_pag.cs <br />