Laserfiche WebLink
<br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: POA <br />ROUTING NUMBER: () i u0~ <br /> <br />$16,000 <br /> <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this 8 day of ;:::)~ 1997, by and <br />between the State of Colorado for the use and benefit of the De ment of Natural Resources, <br />Colorado Water Conservation Board (CWCB), hereinafter referred to as the STATE, and River Oaks <br />on the Roaring Fork Property Owners Association, Inc., 1569 Willits lane, Basalt, Colorado 81621, <br />hereinafter referred to as the BORROWER and/or CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Organization YYYV, Appropriation 197, GBl RORF, Program WTRC, Object Code <br />5120, Reporting Category: 3767, Contract Encumbrance Number C153767. <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />3. Pursuant to the provisions of SS 37-60-119 and 37-60-120, 15 C.R.S. (1990 and 1996 Supp.) the <br />STATE is authorized to loan money for the construction of water projects for the benefit of the <br />people of the STATE, provided that the borrower assures repayment of that money. <br /> <br />4. The BORROWER is a duly constituted Colorado nonprofit corporation formed pursuant to and <br />governed by Articles 20 through 29 of Title 7, C.R.S. (1986 and 1996 Supp.), located in Eagle <br />County, State of Colorado. <br /> <br />5. The BORROWER has applied to the STATE for a loan to be used for the construction of a raw water <br />irrigation system, hereinafter referred to as PROJECT, at a cost of $34,000, <br /> <br />6, The STATE has reviewed a feasibility report prepared by the U.S, Natural Resources <br />Conservation Service and the CWCB staff, which is incorporated herein by reference, and, based <br />upon this feasibility report, the STATE determined the PROJECT to be technically and financially <br />feasible. <br /> <br />7. At its November 25-26, 1996 meeting, the CWCB approved a loan to the BORROWER in an <br />amount not to exceed $25,500 (75% of the cost of the PROJECT) at an interest rate of 4.75% per <br />annum, and for a duration of 10 years. <br /> <br />a, Pursuant to Senate Bill 97 -ooa, Section 1, the Colorado General Assembly authorized the <br />CWCB to loan to the BORROWER an amount not to exceed $25,500 to finance or refinance the <br />PROJECT. <br /> <br />9. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br />mutually agreeable terms and conditions. <br /> <br />River Oaks On The Roaring Fork <br />Property Owners Association, Inc, <br /> <br />Page 1 0111 <br /> <br />Loan Contract <br />