Laserfiche WebLink
<br />" <br />" <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />" <br /> <br />,-.' <br />. . <br /> <br />. <br /> <br />, <br /> <br />.. <br /> <br />EXHIBIT A <br /> <br />~ <br /> <br />HYDRO-TRIAD, LTD. STANDARD RATE SCHEDULE <br /> <br />The following hourly rate schedule for Hydro-Triad, Ltd. personnel providing <br />engineering services on general and specific projects will be utilized on actual <br />time spent for each project activity. Direct costs attributable to a specific <br />project will be billed to the cHent at cost plus 10 percent for Hydro-Triad, <br />Ltd. <br /> <br />TECHNICAl CLASSIFICATION <br />Principal <br /> <br />BILLING RATE <br /> <br />Project Manager <br />Geological/Geo-Hydrologist Consultant <br /> <br />S 75.00 <br />65.00 <br />70.00 <br />52.50 <br />42.50 <br />40.00 <br />35.00 <br />29.00 <br />24.50 <br />24.00 <br /> <br />Project Engineer <br /> <br />Geologist/Geo-Hydrologist <br /> <br />Engineer <br /> <br />Junior Engineer/Designer <br /> <br />Engineering Technician I <br /> <br />Engineering Technician II <br /> <br />Technical Typist-Word Processing, <br />Administrative Support <br /> <br />Technical Typist <br /> <br />Computer System (CPU Time) <br /> <br />Mileage: Company Vehicles - Standard <br />- 4-Wheel Drive <br /> <br />21.00 <br /> <br />. <br /> <br />O.I2/second <br /> <br />.22/mfle <br />.40/mfl e <br /> <br />At cost + 1~ <br /> <br />S 50.00 or cost <br /> <br />Rental Vehicles <br /> <br />Per Di em <br /> <br />Xerox Reproduction 81tz x 11" <br />Blueprint <br /> <br />0.15/copy <br />0.20/ft2 <br />2.75/ftJ. <br />2.15/ftZ <br /> <br />Mylar <br />Sepia <br /> <br />Effective January I, 1987, will be adjusted yearly on January 1. <br /> <br />(]$ <br /> <br /> <br />- <br />