Laserfiche WebLink
<br />i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications, <br /> <br />j, Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings <br />of the PROJECT to the CWCB staff, and, if required by ~ 37-87-105, C,R.S, (1990), the <br />BORROWER shall provide the same drawings to the State Engineer's Office for approval and <br />filing. <br /> <br />k, Upon completion of the PROJECT construction, the BORROWER shall arrange a final inspection <br />for the CWCB staff, CONSTRUCTION FIRM, and the CONSULTANT. <br /> <br />2, Time For PROJECT Completion. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall <br />commence with construction in order to complete the PROJECT no later than two (2) years from <br />the date of this contract. The time for completion of the PROJECT may be extended subject to the <br />approval of the STATE, The BORROWER must provide, in writing, documented justification for any <br />request for extension sixty (60) days prior to the end of the period for completion, <br /> <br />3. Indemnification By The CONSTRUCTION FIRM. The BORROWER shall require all CONSTRUCTION <br />FIRMS and their subcontractors to indemnify the STATE and the BORROWER against all liability and <br />loss, and against all claims and actions based upon or arising out of damage or injury, including <br />death, to persons or property, caused by any acts or omissions of those parties or sustained in <br />connection with the performance of any contract related to the PROJECT or by conditions created <br />thereby, or based upon any violation of any statute, ordinance, or regulation., and the defense of <br />any such claims or actions, <br /> <br />4. Liability Insurance During Construction. The BORROWER shall require the CONSTRUCTION FIRM <br />and its subcontractors to maintain during the term of their contracts for construction of the <br />PROJECT the following insurance with a company that is satisfactory to the STATE: <br /> <br />a. Worker's compensation and employer's liability insurance in'the required statutory amounts, <br /> <br />b. Automobile liability insurance which includes coverage for all owned, non-owned and hired <br />vehicles with minimum limits of $1,000,000 combined single limit for bodily injury and property <br />damage, <br /> <br />c, Commercial general liability insurance with minimum limits of $1,000,000 combined single <br />limit for each occurrence and $2,000,000 general aggregate, This insurance coverage shall <br />include products/completed operations and personal injury, <br /> <br />d, Builder's risk for construction in progress for all perils of loss including fire, wind, hail, <br />vandalism, and flood in an amount equal to the completed value of the PROJECT, <br /> <br />Said general liability insurance shall name the BORROWER and the STATE as additionai insured, <br />An additional insured endorsement and a current copy of a certificate of said liability insurance <br />must be provided to the STATE prior to commencement of construction and maintained untii <br />construction is complete, No payments shall be made to the BORROWER unless all insurance <br />certificates are current. Notices of renewals of said policies shall also be filed with the STATE as <br />they occur. <br /> <br />During the time of construction, the STATE reserves the right to increase the above amount of <br /> <br />Smith Irrigation Ditch <br /> <br />Page 3 of 13 <br /> <br />Loan Contract <br />