Laserfiche WebLink
<br />. <br /> <br />Table 2 - Sources of Funding <br /> <br />Entitv Grant Loan <br />CWCB Construction Fund Loan $0 $100,000 <br />CWCB Construction Fund Loan $0 $150,000 <br />JPSP $80,000 $0 <br />Totals $80,000 $250,000 <br /> <br />0/0 Particioation <br /> <br />75% <br /> <br />25% <br />100% <br /> <br />The JPSP will cover any costs that exceed the estimated project cost, <br /> <br />. <br /> <br />The initial $100,000 CWCB loan was at the tenus of 3,5% for 30 years, JPSP is requesting a second 30- <br />year loan from the CWCB, Since this loan will be for agricultural purposes, the lending rate will be 2,75% <br />for 30 years, The weighted average interest rate (both loans, totaling $250,000) is 3%, The new total loan <br />amount of $250,000 presents approximately 75% of the estimated total project cost of$330,000, <br /> <br />Based on the above weighted average interest rate and loan period, the annual payment from the JPSP to the <br />CWCB will be $14,030 (including the 10% reserve requirement) per year at the loan tenus of 3% for 30 <br />years, This represents $68.51 and $40,08 per acre-foot, based on reservoir storage capacities of 250 and <br />350 acre-feet respectively, Table 3 shows a summary of the financial aspects of the project. <br /> <br />Table 3 - Financial Summary <br /> <br />Project Cost <br />Number of Shareholders <br />Number of Shares of Stock <br />CWCB Loan Amount <br />CWCB Loan Payment (includes 10% reserve) <br />Annual Loan Cost per acre-foot (New Reservoir Volume = 350 acre-feet) <br /> <br />$330,000 <br />I <br />N/A <br />$250,000 <br />$14,030 <br />$40,08 <br /> <br />. <br /> <br />Credit Worthiness <br /> <br />The JPSP has 2 existing loans with Lend Leas Agri-Business of Englewood Colorado, The outstanding <br />balance for these loans is $3,95 million, Loan approval will be subject to an acceptable credit report from <br />the lender. Table 4 shows the Financial Ratios for the JPSP and indicates 2 in the strong category and 2 in <br />the weak category with the $250K CWCB loan in place, Partnership income varies from year to year <br />depending on the agricultural market and is affected by one-time land purchase and sale events, <br /> <br />. <br /> <br />Manin Cull Dam Rehabilitation Feasibility Study <br /> <br />May 2002 <br /> <br />Page 7 <br />