My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00465
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:28:06 AM
Creation date
10/6/2006 12:08:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150083
Contractor Name
John Peroulis and Sons Partnership
Contract Type
Loan
Water District
44
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. . ~. ,,:. <br />. <br /> <br />10.8.(3) A final construction report containing the following <br />information, if applicable in accordance with the requirements of Rule <br />9: <br /> <br />10.8.(3)(a) A summary of construction, problems <br />encountered, and solutions implemented to resolve the problems; and, <br /> <br />10.8.(3)(b) A summary of construction material tests <br />and geologic observations; and, <br /> <br />. <br /> <br />10.8.(3)(c) Photographs of construction if required, <br />from exposure of the foundation to completion of construction; and, <br /> <br />10.8.(4) A record of the location of permanent monuments' and <br />instrumentation as well as initial surveys and readings shall be <br />submitted if applicable. <br /> <br />10.8.(5) A schedule for the first filling of the reservoir, <br />specifying fill rates, water level elevations to be held for <br />observation, and a schedule for inspecting and monitoring the dam. No <br />filling schedule is required for minor dams rated Class III and all <br />Class IV dams or if waived by the State Engineer for good cause <br />shown. The owner, however, shall monitor the dam frequently during <br />the first filling. . <br /> <br />10.8.(6) A long-term instrumentation monitoring plan for new <br />dams and enlargements (except for minor Class III and all Class IV <br />dams) which shall include: . <br /> <br />10.8.(6)(a) The frequency of monitoring; <br /> <br />10.B.(6)(b) The data recording format; <br /> <br />10.8.(6)(c) A graphical presentation of data; and, <br /> <br />10.B.(6)(d) The parties who will perform' the work. <br /> <br />10.8.(7) The engineer shall provide periodic review of the <br />data included in the long-term monitoring plan on at least an annual <br />basis for the first five years, whereupon the monitoring shall <br />continue in accordance with Rule ls.C. (2) and ls.C. (3). The engineer <br />shall submit the data and a written assessment of the dam's <br />performance to the State Engineer annually. <br /> <br />10.8.(8) An Emergency Preparedness Plan which conforms to <br /> <br />Rule 16. <br /> <br />. <br /> <br />10.8.(9) Upon written request by the owner and for good <br />cause shown, the State Engineer may temporarily approve storage of <br />. water prior to full compliance with Rule lOB. The written request <br />shall include a schedule for compliance with Rule lOB. <br /> <br />. <br /> <br />. 36 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.