My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153701 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153701 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 7:50:04 AM
Creation date
10/6/2006 12:08:08 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153701
Contractor Name
Fort Morgan, City of & Fort Morgan Water Works and Distribution Enterprise
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB94-029
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. .;1 <br /> <br />attributable to the operation of the Pipeline, <br /> <br />vi. Allottee agrees to make payment of, pursuant to the procedures set out in paragraph <br />B.a. below and subject to paragraph B.b. below, its share of such an annual amount as <br />the Board shall determine to be necessary to establish and Daintain an operating and <br />maintenance reserve fund equal to eighteen months operating and maintenance charges <br />and costs. <br /> <br />c. The payments described in this paragraph 6 and in paragraph B belo. are full payment for all <br />water delivery services to be provided to Allottee under this Contract. No other charge, fee, <br />tax, or levy for the Pipeline or the use thereof, shall je made to Allottee or its citizens, <br />directly or indirectly by SWSP Enterprise; except for an" fees, cbarges or assessments charged <br />or levied by the District or Subdistrict in connection ,ith allotnent contracts for District <br />water or Subdistrict water or inclusion of the Allottee or its land lrea within the boundaries <br />of the District or Subdistrict, or taxes charged or levied by the )istrict or Subdistrict on <br />lands included within the District or Subdistrict. <br /> <br />d. All money paid to the S.SP Enterprise by the Allottee Inder this Contract shall be kept in <br />separate accounts from all other accounts of the SWSP Enterprise or the District and shall be <br />used only for Pipeline purposes as specified in this Contract. <br /> <br />7. Estimated Demand and Deliverv Schedule. Commencing in the year in .hich the Pipeline becomes <br />operational and on or before December 1 of each year thereafter, Allottee shall provide the SWSP Enterprise with <br />an estimated demand and delivery schedule for the use of its capacity, not to exceed tbe amount allotted herein, <br />for the following calendar year. This schedule shall contain the time and guantities of water which Allottee <br />estimates it shall require to be transmitted by the Pipeline. This schedule may be nodified by the Allottee <br />from time to time as the need warrants, in its sole discretion, within the physical capabilities of the <br />Pipeline. Such demand and delivery schedules shall be consistent with the demand and delivery schedules <br />submitted by Allottee for use of capacity in the Carter Lake to Broomfield Pipeline. <br /> <br />B. Pavment of Charoes. <br /> <br />a. Payment of the costs for annual administration, operation and maintenance, including repair, <br />shall be the responsibility of the Participants which shall be allocated on the same <br />percentages which determine each Participant's Construction costs, including the Allottee's <br />Construction Costs as set forth on Schedule B. No later than three (3) months prior to the <br />completion of construction of the Pipeline, the SWSP Enterprise shall issue a billing statement <br />to Allottee requiring payment of the anticipated annual charges and costs to be incurred for <br />administration, operation, maintenance, repair and replacement of the Pipeline for the <br />remainder of that Fiscal Year, pursuant to paragraphs 6.b." and 6.b.,i. above and to establish <br />reserve funds. In succeeding years, a statement of estiDated annual charges shall be issued <br />on or before October 15 of each year for the current Fiscal Year. A billing statement for <br />annual charges shall be issued on or before January 15 of each year for the current Fiscal <br />Year. Charges and costs for administration, operation, Jaintenance, repair and replacement <br />of the Pipeline shall be allocated either as General Pipeline Costs, Indi'iidual Segment <br />Specific Costs or Non-Segment Specific Costs as described in paragraphs 5.a., 5.b. and 5.c. <br />above. Except for the flrst year, estimated charges and costs for adninistration, operation, <br />maintenance, repair and replacement shall be based on the anticipated use of the Pipeline for <br />the current Fiscal Year using the costs of administration, operation, maintenance, repair and <br />replacement for the prior Fiscal Year, plus any positi'ie and negat:'ie adjustnents necessary <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.