My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153701 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153701 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 7:50:04 AM
Creation date
10/6/2006 12:08:08 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153701
Contractor Name
Fort Morgan, City of & Fort Morgan Water Works and Distribution Enterprise
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB94-029
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'."~~~~ <br /> <br />order to ensure that there is no lapse in the S.SP Enterprise's rights to access the Federal <br />Facilities for use in connection ,ith the Carter Lake to Broonfield Pipeline, provided that <br />the participants therein have provided the SwSP Enterprise with adequate funds to operate, <br />maintain, repair and replace the Carter Lake :0 Broomfield Pipeline under the allotment <br />contracts with the participants therein. <br /> <br />d. The SWSP Enterprise agrees to design, construct, complete, operate, maintain, repair and <br />replace the Pipeline in accordance with applicable federal, state and local laws, including, <br />but not limited to, those Colorado statutes ,hicb require posting of performance and labor and <br />material bonds and withholding of retainage. ' <br /> <br />e. Allottee's rights in the Pipeline shall not include; <br /> <br />i. Rights-of-Way Acquired in Connection with the Pipeline. All rights-of-way acquired <br />in connection with the Pipeline shall belong to the S.SP Enterprise subject to the <br />obligation of SwSP Enterprise to make reiobursement to the Participants for future use <br />of the rights-of-way as set forth herein. Ose of these rights-of-way by any <br />Participant for any purpose other than the Pipeline is at tbe sole discretion of the <br />Board; except that all Participants shall have the right to use the Pipeline rights- <br />of-way at no increased cost to connect to the Pipeline and obtain delivery of water <br />at their respective points of delivery described in Schedule A (or any changed point <br />of delivery), and to cross the Pipeline rights-of-way with their own utility lines so <br />long as such utility lines do not unreasonably interfere with the operation, <br />maintenance and replacemer.t of the Pipeline. This provision shall not in any way <br />affect the exercise by any Participant of its rights in its own property that may be <br />crossed by the rights-of-',ay acquired in connection .ith the Pipeline. Except as <br />provided above, all Entities shall be required to pay the Participants for use of the <br />rights-Of-way in an amount equal to the greater of a) the appraised value of the right <br />to so use the Pipeline rights-of-way at that time orb) one-half of the actual cost <br />of acquisition of the penanent Pipeline rights-of-',ay plus all carrying costs <br />including interest at nine percent i9%) from the date of acquisition of the rights-of- <br />way through the date of conveyance. The paynent shall be divided among the <br />Participants based upon their contributions to the original cost of the Pipeline <br />rights-of-way deternined on a Segment-by-Segment basis as established in the <br />percentages set forth on Schedule 3-3. <br /> <br />11. Hydroelectric POwer Potential. The SwSP Enterprise shall own all rights to generate <br />hydroelectric po',er at any location along :he Pipeline; provided, however, that <br />generation of hydroelectric po.er shall in no .ay interfere with the delivery of water <br />to the Allottee. 'Tbe Participants shall have the right to participate in the <br />construction, operation' and maintenance of any hydroelectric power generating <br />facilities along the Pipeline by the S.SP Enterprise, and to the extent they do, they <br />shall be entitled to receive revenues ge~erated thereby, but Allottee shall otherwise <br />have no Obligation to pay any part of the cost of construction, operation or <br />maintenance of any such facilities. -'.lloHee shall own all rights to generate <br />hydroelectric power at locations along Allottee's pipelines which are connected to but <br />not part of the Pipeline. Allottee shall Jot construct pipelines, hydroelectric power <br />generating facilities, or any other facilities wbich are hydraulically connected to <br />the Pipeline ,ithout :irs: obtainina prior technical approval for such facilities in <br />.Titing from the SwSP Enterprise to ensure that such facilities do not interfere with <br />the hydraulic characteristics or operations of the Pipeline, or other,ise potentially <br />damage the Pipeline, Should the Ulottee's generation of hydroelectric power or <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.