My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00452
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:40:32 PM
Creation date
10/6/2006 12:08:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153603
Contractor Name
Erie, Town of
Contract Type
Loan
Water District
6
County
Weld
Bill Number
SB 90-41
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lC .' <br /> <br /> <br />. <br />TOWN OF ERIE <br /> <br />. <br /> <br />, , <br /> <br />645 HOLBAOOK P.O. BOX 100 <br />ERIE, COLORADO 80516 <br />LOCAL (303) 828,3843 <br />METRO (303) 665-3555 <br /> <br />February 24, 1994 <br /> <br />Mr. Larry Lang <br />Colorado Water Conservation Board <br />1313 Sherman, Room 721 <br />Denver, CO 80203 <br /> <br />RE: Erie Flood Control Project <br /> <br />Dear Mr. Lang: <br /> <br />As a follow up to our January 1994 discussions regarding an <br />amendment to our January 21, 1992 contract for the Erie Floqd <br />Control Project, I request an extension in the completion schedule <br />for the project. As the case for many Public Works projects, our <br />project required additional time in securing project right-of-way, <br />FEMA CLOMR approval, and approval of final design features by all <br />interested parties. <br /> <br />It has taken nearly two years to begin the construction stage for <br />the project. First, Weld County had refused to complete their part <br />of the project, the Weld County Bridge on Road #8, for political <br />reasons. This has now been completed. Addititionally, right-of- <br />way purchases took longer and there have been numerous changes in <br />final design. <br /> <br />Finally, the project required cooperation from the Union Pacific <br />Rail Road (UPRR) Company. This is an entity that a municipality <br />has less control and influence over than many entities, it is <br />regulated by the Public Utilities Commission. The Town has secured <br />all the required agreements with the UPRR. <br /> <br />There are other reasons for our delay. As expressed to the Board <br />during our January 20th presentation, flood projects are extremely <br />complicated and take many years from the drawing board to <br />construction. I understand that the Er ie proj ect actually has <br />taken less time than many other flood projects undertaken within <br />Colorado. <br /> <br />POLICE DEPT. P.O. BOX 510 METRO (303) 449-3156 LOCAL (303) 828.3200 <br /> <br />LONGMONT FIRE PROTECTION DISTRICT (303) 666,4404 <br /> <br />AI.A-c.t\MeNI ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.