Laserfiche WebLink
<br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 2 (continued) <br />COST ESTL\lA TE <br />OWL CREEK DITCH <br />CO~IROLSTRUCTGRES <br /> <br /> louANTITY UNIT <br />ITEM DESCRIPTION lTh1TS PRICE A..\fOUNT <br />I CONTROL STRUCTURES <br /> f. Structure 8 <br /> Remove Exisitng Structure 1.00 LS. S I ,000.00 $1.000 <br /> Concrete 25.00 C.Y. S~OO.OO $10,000 <br /> ExcavationIBackfill 125.00 C,Y. $12.00 $1,500 <br /> Riprap 30.00 c.Y. $3$.00 $1,050 <br /> Bedding 10.00 C.Y. $20.00 $200 <br /> $0 <br /> $13,750 <br /> g. Structure 9 <br /> Remove Exisitng Structure 1.00 L.S. $1,000.00 $1,000 <br /> Concrete 15.00 c.Y. $400.00 $6.000 <br /> ExcavationIBackfill 100.00 c.Y. $12.00 $1,200 <br /> Riprap 30.00 c.Y. $35.00 $1.050 <br /> Bedding 10.00 c.Y. $20.00 $200 <br /> Gate 1.00 LS. $350.00 $350 <br /> $9,800 <br /> h. Structure 10 <br /> Remove Exisimg Structure 1.00 LS. $ I ,000.00 $1,000 <br /> Concrete 15.00 c.Y. $400.00 $6.000 <br /> Excavation/Backfill 75.00 C.Y. $12.00 $900 <br /> Riprap 30.00 C.Y. $35.00 $1,050 <br /> Bedding 10.00 C.Y. $20.00 $200 <br /> $9.150 <br /> 1. Structure 11 <br /> Remove Exisitng Structure 1.00 L.S. $ 1 ,000.00 $1.000 <br /> Concrete 15.00 C.Y. $400.00 $6.000 <br /> EXC3vation/BackfiJl 100.00 c.Y. $12.00 $2,400 <br /> Riprap 30.00 C.Y. $35.00 $1.050 <br /> Bedding 10.00 C.Y. $20.00 $200 <br /> Pipe - 18" HDPE 150.00 LF. $25.00 $3.750 <br /> $14.400 <br /> j. ?-.liscellaneous Checks <br /> Concrete 150.00 c.Y. $400.00 $60,000 <br /> ExcavationIBacktill 1200.00 c.Y. $12.00 514,400 <br /> Riprap 180.00 c.Y. $35.00 $6,300 <br /> Bedding 60.00 C.Y. 520.00 $1.200 <br /> 581,900 <br /> <br />TOTAL CONSTRUCTION COST <br />Contingencies@ 15% <br />Engineering <br />OPINION OF TOTAL COST <br /> <br />$230.100 <br />$35,000 <br />$3..\.500 <br />$299.600 <br />