My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153354 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153354 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:12:01 AM
Creation date
10/6/2006 12:07:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153354
Contractor Name
Paradox Valley Canal and Reservoir Company
Contract Type
Loan
Water District
61
County
Montrose
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />agreement contained herein, the State, at its option, may (a) <br />declare the entire principal amount then outstanding <br />immediately due and payable; (b) for the account of the <br />Contractor incur and pay reasonable expenses for repair, <br />maintenance, and operation of the system herein described and <br />such expenses as may be necessary to cure the cause of default; <br />and/or (c) take possession of the system, repair, maintain, and <br />operate or iease it. The provisions of this contract may be <br />enforced by the State at its option without regard to prior <br />waivers by it of previous defaults by the Contractor, through <br />judicial proceedings to require specific performance of this <br />contract or by such other proceedings in law or equity as may <br />be deemed necessary by the State to insure compliance with <br />provisions of this contract and the laws and regulatIons under <br />which this contract Is made. <br /> <br />C. The State agrees that it shall: <br /> <br />1. Make available to the Contractor for the purpose of <br />this contract not to exceed the sum of One Hundred Thousand <br />Doilars <$100,000). Said One Hundred Thousand Ooliars <br />($100,000) shall be made available to the Contractor in <br />accordance with the following terms and conditions: <br /> <br />a. Beginning with the monthly period commencing <br />August 15, 1981, and for every month thereafter untIl <br />said project has been completed, the Contactor shali <br />prepare with the assistance of the consuiting <br />engineer referred to in paragraph A.1. above dn <br />estimate of the funds required from the State for <br />project construction during that month dnd shail <br />forwdrd said estimate to the State not less thdn <br />fifteen (15) days prior to the beginning of such <br />month. <br /> <br />b. Upon receipt and approval by the State of such <br />monthly estimate, the State will, within forty (40) <br />days from the receipt of such estimate, pay over to <br />the Contractor the amount of the monthly estimate or <br />such portion thereof as has been approved by the <br />State. <br /> <br />c. No payments will be made under this contract <br />until the project plans and specifications referred <br />to in paragraph A.l. above are approved by the State. <br /> <br />2. Provide the Contractor with such technical assistance <br />as the State deems appropriate in planning, constructing, dnd <br />operating the project and in coordinating the project with <br />local official comprehensive plans for sewer and water and with <br />any State or area plans for the area in which the project is <br />located. <br /> <br />D. This contract is not assignable by the Contractor except <br />with written approval of the State. <br /> <br />E. The parties to this contract intend that the relationship <br />between them contemplated by this contract Is that of <br />employer-independent contractor. No agent, employee, or <br />servant of the contractor shall be or shall be deemed to be an <br />employee, agentJ or servant of the State. The Contractor will <br />be solely and entirely responsible for its acts and the acts of <br />its agents, employees, servants, and Sub-contractors during the <br />performance of this contract. <br /> <br />F. At all times during the performance of this contract, the <br />Contractor shall strictly adhere to all applicable federal and <br />state laws that have been or may hereafter be established. <br /> <br />Page 4 of 7 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.