Laserfiche WebLink
<br />the BORROWER shall provide the as-built drawings to the State-Engineer's Office for <br />approval and filing. <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />. are due. <br />SECTIONS - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements, . <br />A. Preparing final designs and specifications for the PROJECT. <br />B, Preparing bid and construction contract documents, <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />0, Complying with all federal, state. and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations, <br />F. Actual construction as called for in. the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management,. including design and <br />construction management for CWCB-approved change orders. <br />H_ Interest during completion of the PROJECT pursuant to Paragraph A.4 herein, <br />I. Legal seNices for reviewing engineering seNices contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state. <br />and local regulatory requirements. <br />SECTION 9 ..:. DISBURSEMENT SCHEDULE <br />The BORROWER shall prepare a periodic progress report which contains a statement <br />of the PROJECT costs expended for that period and shall forward said statement to <br />the CWCB. After receipt of the periodic progress report from the BORROWER. and <br />review and acceptance of the items therein as. eligible expenses as described <br />below, the CWCB will pay to the BORROWER the amount set forth in the report or <br />such portion that has been approved by the CWCB. Such payment shall be made <br />within thirty (30) days from the CWCB's approval of each progress report. The <br />BORROWER shall obtain all necessary permits and easements prior to any loan <br />disbursements. <br />SECTION 10 - TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract which is the date this <br />contract is approved by the State Controller. . <br />PROJECT Finish: 2 years from the Effective Date of this Contract <br /> <br />Page 3 of 3 <br />