My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00372
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2010 3:20:46 PM
Creation date
10/6/2006 12:06:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153682
Contractor Name
Caryl R. Carroll
Contract Type
Loan
Water District
43
County
Rio Blanco
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />258389 <br /> <br />6-526 p_c , 10/10/-1996 10: 19A PG 7 <br /> <br />OF 12 <br /> <br />EXHIBIT "Au <br /> <br />COUNTY OF go ....!!.LANCQ.,. STATE .!!!. COLORADO: <br /> <br />hn undivided 1/2 interest in the First Enlargement <br />of the Martin Creek Ditch and a like interest in the 6.06' <br />second feet of water allowed to flow therein under Priori~y <br />52 (September 1960 adjudication)/ <br /> <br />hn undivided 1/2 .interest in the D. D. G. E. <br />Reservoir (also known 115 Hulett Reservoir, Aldrich Reservoir <br />and Durham Reservoir! and II like interest in. the 000 acre <br />feet of water allowed to be stored therein undcr priority 2 <br />and II like interest in the 400.03 ncre feet of water allowed <br />to be ~tored therein under. Priority 43a/ . <br /> <br />hn undivided' 1/2 interest in the liise Enlnrgement <br />of the 0: D. & E. Reservoir and II like interest in the <br />1,007.22 acre feet of water allowed to be stored therein <br />under Priority 7 (September 1960 adjudication), together liith <br />a 1/2 interest in the 47.1: second feet of Wll ter lIllo..ed to <br />flow through the Hartin Creek Ditch under priority 7 <br />(September 1960 adjudication) to the D. D. & E. Reservoir for <br />storage/ <br /> <br />h11 interest 'in the Thornburgh Ditch and all <br />interest .in the 2.38 second feet of water allo~lOd to flow <br />therein under Priority 17 (September 1960 adjudication)/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.