My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00368
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 3:19:25 PM
Creation date
10/6/2006 12:06:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153639L
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. , <br /> <br />~ <br />" <br />~ <br /> <br />..>~ <br />~ <br /> <br />-;-. ~ <br /> <br />. <br /> <br />. <br /> <br />P 03 <br /> <br />June 14, 1993 <br />Eatrin, Colorado <br />Irrigating - 3 <br /> <br />What costs are included in the construction cost? <br />preparation, concrete, rebar, forming and placement are <br /> <br />Question: <br />Site <br />included. <br />Engineering, <br />included. <br /> <br />contingencies, legal fees and <br /> <br />interest are not <br /> <br />Question: Is one sand gate adequate? . <br />The sand gate would remain the same as it has been for an <br />extended time, The sand gate is such that it handles all small <br />flows and all water deliveries that are . r~quired to pass the <br />river diversion.. It also has the largest vblume of flow and <br />greatest head pressure during higher river flo~5. Thus the bulk <br />of the sand is projected to pass through the sand gate or down <br />the canal the same as it has in time past~ <br /> <br />Question: When would demolition of t~e current structure be <br />started? . <br />This fali; 'right after Labor Day with the construction being <br />finished by Christmas. <br /> <br />The Tellers reported. <br />represented in person <br />quorum was present;. . <br /> <br />shares of capital stock were <br />The Chairman declared that a <br /> <br />that 1150.5 <br />or by proxy. <br /> <br />Recommendation of the Board of Directors'. was presented to <br />construct a new uncontrolled spillway diversion structure as <br />presented in alternative three; that the cost of the construction <br />be paid with financing through the Colorado Water Conservation <br />Board; and that repayment of the loan to the be by dividing the <br />number of capital shares of stock in The New Cache La Poudre <br />Irrigating Company (2499.69) into the annual payment to the <br />Colorado Water Conservation Board and adding such to the annual <br />assessment of The New Cache La Poudre Irrigating Company until <br />such note with the Colorado Water Conservation Buard is paid in <br />full. <br /> <br />Question: Have you calculated the difference between a fifteen <br />and a twenty year term? <br />Various terms were projected. Colorado Water Conservation <br />Board sets the terms for the projects in which they participate <br />based upon the evidence furnished in the feasibility study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.