My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00368
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 3:19:25 PM
Creation date
10/6/2006 12:06:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153639L
Contractor Name
New Cache La Poudre Irrigating Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~." <br />. ) <br /> <br />2. Three (3) copies of the final report called for in this <br />contract shall be furnished to the state not later than Ninety <br />(90) days after the date of this contract, unless such time is <br />extended by mutual agreement of the parties hereto in writing. <br /> <br />3. As compensation for the services of the Contractor, the <br />state shall pay to the Contractor the sum of Nine Thousand Five <br />Hundred Seventy-Seven Dollars and Fifty Cents ($9,577.50) <br />in the manner following: <br /> <br />a. Sixty percent (60%), to wit, Five Thousand Seven Hundred <br />Forty-Six Dollars and Fifty Cents ($5,746.50) of the total <br />amount due in two (2) monthly installments of Two Thousand <br />Eight Hundred Seventy-Three Dollars and Twenty-Five Cents <br />($2,873.25) each, commencing thirty (30) days after the date <br />of this contract. <br /> <br />b. The rema~n~ng forty percent (40%), to wit, Three <br />Thousand Eight Hundred Thirty One Dollars ($3,831) within <br />forty (40) days following receipt and acceptance of the <br />written report specified in paragraph 2. of this contract. <br /> <br />4. The total cost of services to be rendered for the <br />Contractor by the Consultant is Nineteen Thousand One Hundred <br />Fifty-Five Dollars ($19,155) and the Contractor shall pay the <br />sum of Nine Thousand Five Hundred Seventy-Seven Dollars and <br />Fifty Cents (9,577.50) as agreed to by letter dated November 4, <br />1992, which is hereby attached and made a part of this contract <br />as Appendix Bi and in no event shall this payment be the <br />liability of the State of Colorado. <br /> <br />5, In consideration of the State assuming a portion of the <br />cost of the preparation of the said project feasibility report, <br />the Contractor shall pay to the State the sum of Twelve Thousand <br />Four Hundred Three Dollars ($12,403) provided that construction <br />of the subject water project is initiated within ten (10) years <br />of the date of this contract. The Contractor shall fulfill this <br />obligation irrespective of how or by whom or to what <br />specifications or plans the subject project is financed, paid, <br />or constructed for so long as construction of the project is <br />initiated within the specified time. <br /> <br />6, In the event the Contractor must make payment pursuant. <br />to the terms of paragraph 5. above, then the said sum of Twelve <br />Thousand Four Hundred Three Dollars ($12,403) shall be payable <br />in ten (10) equal yearly installments of One Thousand Two <br />Hundred Forty Dollars and Thirty Cents ($1,240.30) each, the <br />first installment to be due and payable upon the January 1st <br />next succeeding the initiation of construction on the said water <br /> <br />Page ~ of i Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.