My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150088 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150088 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 11:03:36 AM
Creation date
10/6/2006 12:06:17 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150088
Contractor Name
Appleton Northwest (ML369) Lateral and Drainage Corporation
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans and. <br />specifications. <br /> <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, or, if required by !l 37-87-105, C.RS., the <br />BORROWER shall provide the as-built drawings to the State Engineer's Office for approval <br />and filing. <br /> <br />K. Upon completion of the PROJECT cQnstruction, the BORROWEiR shall arrange a final <br />inspection for the CWCB staff. <br /> <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br />due. <br /> <br />SECTION 9 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> <br />A. Preparing final designs and specifications for the PROJECT. <br /> <br />B. Preparing bid and construction contract documents. <br /> <br />C. Preparing environmental assessment or environmental impact statements, and otherwise <br />complying with the Federal National Environmental Policy Act. <br /> <br />D. Complying with all federal, state, and local regulatory requirements, including the obtaining <br />of all required permits. <br /> <br />E, Fish and wildlife mitigation measures required by federai, state, or local laws and <br />regulations. <br /> <br />F. Actual construction as called for in the design documents and in change orders approved <br />by the CWCB and the BORROWER. <br />, . <br />G. Engineering services for construction' management, 'including design and' construction <br />management for CWCB-approved change orders. <br /> <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.3 herein. <br /> <br />I. Legal services for reviewing engineering services contracts, reviewing this contract, <br />reviewing construction contract documents, and for complying with all federal, state, and <br />local regulatory requirements. <br /> <br />SECTION 10 - Additional Contract Requirements <br /> <br />No additional contract requirements <br /> <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.