My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150108 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150108 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:25:25 AM
Creation date
10/6/2006 12:05:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150108
Contractor Name
Delta Canal Company, The
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~~ft <br />~ -o-1!- DELTA <br />~~ r): <br />~~ <br />t!!lll <br />~ <br /> <br />CANAL CO:~ <br />ESTABLISHED APRIL 24. 1882 r-@ <br />I <br />Delta. Cou.n.ty, Colora.do ~ <br /> <br />Cost Estimate <br />The estimated total project cost for the selected project is <br />$133,000. The NRSC will provide project planning and engineering <br />design. <br /> <br />1. Planning and Design Costs <br />by NRCS <br />2. Construction Cost <br /> <br />$0.00 <br /> <br />Total Cost <br /> <br />$133,000.00 <br />$133,000.00 <br /> <br />The NRCS cost estimate is included in Appendix B. <br /> <br />Implementation Schedule <br />The following schedule is proposed for implementation of the <br />project: <br />Task Target Completion Date <br /> <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Start Construction <br />4. Complete Construction <br />5.Project is Operational <br /> <br />09/0112002 <br />09/0112002 <br />10/0112002- <br />04/0112004-05 <br />04/0112005 <br /> <br />Social, Economic, and Physical Impacts <br />The project will have no significant social impacts. Members at <br />the lower end of the Delta Canal Company will have enough water in low <br />years to adequately irrigate crops. The project will have no significant <br />physical impacts once construction is complete. The new concrete canal <br />will improve the safety of the canal along 1600 Rd. and will follow the <br />same design of the canal now. <br /> <br />pg.1O <br />
The URL can be used to link to this page
Your browser does not support the video tag.