Laserfiche WebLink
<br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NU~~eER: PDA <br /> <br />ROUTING NUMBER: <br /> <br />mOd,- ~ <br /> <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this J.2!jday of OrToAE/?_ 2000, by and between the <br />State of Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board, hereinafter referred to as the CWCB and/or STATE, and Plumb and Dailey Ditch <br />Company, a Colorado nonprofit corporation, 9595 Nelson Road, Box C, Longmont, Colorado, 80501 <br />hereinafter referred to as the BORROWER and/or CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Organization YYYY, Appropriation SPL, GBL P048, Program WTRC, Object Code <br />5881, Reporting Category: 0048, Contract Encumbrance Number C150048. <br /> <br />2, Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />3. Pursuant to the provisions of 99 37-60-119 and 37-60-120, C.R.S, (1999) the STATE is authorized <br />to loan money for the construction of water projects for the benefit of the people of the State, <br />provided that the borrower assures repayment of that money. <br /> <br />4. The BORROWER is a duly constituted Colorado nonprofit ditch company formed pursuant to and <br />governed by Articles 42 and 121 of Title 7, C.R.S., located in Weld County, State of Colorado, <br /> <br />5. A Small Project Loan Account was established by 937-60-122.7, C.R.S. (1999), which authorizes <br />the CWCB to make loans of up to $100,000 without prior approval from the General Assembly if <br />the CWCB determines that delay would result in undue hardship on the borrower, <br /> <br />6, The BORROWER has applied to the STATE for a Small Project Loan in the amount of $42,000 to be <br />used for rehabilitation of its diversion structure on Boulder Creek, hereinafter referred to as <br />PROJECT, at a total cost of $46,620, <br /> <br />7, The STATE has reviewed a feasibility report compiled with assistance from the NRCS and John <br />Van Sciver of the CWCB, which is incorporated herein by reference, and, based upon this <br />feasibility report, the STATE determined the PROJECT to be technically and financially feasible, <br /> <br />8, This loan qualifies as a Small Project Loan in accordance with 9 37-60-122.7, C.R.S. (1999), <br />since the amount of the loan does not exceed $100,000 and the BORROWER will suffer undue <br />hardship if the project is not completed as soon as possible because of the inability to deliver <br />water. <br /> <br />9. At its May 2000 meeting, the CWCB approved a loan to the BORROWER in an amount up to <br />$42,000, not to exceed 90% of the cost of the PROJECT, at an interest rate of 3,75% per annum <br />for a repayment period of 20 years, The CWCB has determined that the BORROWER will suffer <br />undue hardship if the project is not completed as soon as possible because of the inability to <br />deliver water, <br /> <br />Plumb and Dailey Ditch Company <br /> <br />Page 1 of 12 <br /> <br />Loan Contract <br />