Laserfiche WebLink
<br />AGENCY NAME: Water Conservation Board <br />AGENCY NUMBER: PDA <br />ROUTiNG NUMBER: <br /> <br />$100,000 <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this ~ day of ,C::; ~ 1998, by and between the State of <br />Colorado for the use and benefit of the Department of atural Resources, Colorado Water Conservation <br />Board (CWCB), hereinafter referred to as the STATE, and The Westem Mutual Ditch Company, 1007 9th <br />Avenue, Greeley, CO 80631, hereinafter referred to as the BORROWER and/or CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1, Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Organization YYYY, Appropriation Code SPL, GBL W857, Program WTRC, Object <br />Code 5120, Reporting Category: 3857, Contract Encumbrance Number C153857. <br /> <br />2, Required approval, clearance, and coordination have been accomplished from and with appropriate <br />agencies, <br /> <br />3, Pursuant to the provisions of 9937-60-119 and 37-60-120, C.R.S, (1997) the STATE is authorized to <br />loan money for the construction of water projects for the benefit of the people of the STATE, provided <br />that the borrower assures repayment of that money. <br /> <br />4, Section 37-60-122,7, C.R,S. (1997) authorizes the STATE to make loans of up to $100,000 <br />from the Small Project loan Account of the Construction Fund without prior approval from the <br />General Assembly if the STATE determines that delay would result in undue hardship on the <br />borrower, <br /> <br />5. The BORROWER is a duly constituted Colorado ditch and reservoir company govemed by 99 7-42- <br />101 et sea, and 7-40-101 et sea" C.R.S" located in Weld County, State of Colorado. <br /> <br />6. The BORROWER has applied to the STATE for a loan in the amount of $100,000 to be used to <br />rehabilitate its check dam on the South Platte River, hereinafter referred to as PROJECT, at a cost of <br />$140,000, <br /> <br />7. The STATE has reviewed a feasibility report compiled by Mark McLean, P,E. of Rocky Mountain <br />Consultants, which is incorporated herein by reference, and, based upon this feasibility report, the <br />STATE determined the PROJECT to be technically and financially feasible, <br /> <br />8, This loan qualifies as a Small Project loan under ~ 37-60-122.7, C.R.S, (1997). because the <br />amount of the loan does not exceed $100,000 and the BORROWER will suffer undue hardship if <br />the PROJECT is not completed because, without completion of the PROJECT, high water may <br />cause the diversion dam and head gate to fail completely. <br /> <br />9, At its May 11-12, 1998 meeting, the CWCB found that delay in completing the PROJECT would cause <br /> <br />Western Mutual Ditch Company <br /> <br />Page 1 of 13 <br /> <br />Loan Contract <br />