My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00189
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 9:50:07 AM
Creation date
10/6/2006 12:04:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150006
Contractor Name
Palisade, Town of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Segmt <br /> <br />1 (E) <br /> <br />2-4(N) <br /> <br />4-7(N) <br /> <br />8(E) <br /> <br />Control <br />Cap. l.ocation <br />(MGD) <br /> <br />Controlling <br />Factor <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />b. Resu]t~ of Calculations for Nannal Operation. The following tables show <br />pipeline size required for the two new segments from the Cabin Reservoir <br />outlet box to the Wye, and for the two existing segments (Cabin Outlet <br />Works and Wye to WTP) for nonnal operation. <br /> <br />Table V-I <br />Normal Operation <br />Pipe Si71!S ReqJlired for Palisade Demand Only - 3.3 to 3.8 MGD <br /> <br />Description <br /> <br />Dia. <br />Reqd. T .en gth <br />(in.) (ft.) <br />30" 584' <br /> <br />Cabin Outlet Works <br /> <br />Cabin Outlet Box - <br />Kruzen Box <br /> <br />10" <br /> <br />1900' <br /> <br />Kruzen Box to Wye <br /> <br />12" <br /> <br />20,100' <br /> <br />Wye to WTP <br /> <br />12" <br /> <br />5225' <br /> <br />4.8 Inlet to Pipe W.S. E1ev. <br /> (5' depth min.) <br />4.2(1) Outlet MinP' (2) <br />. lpe <br /> (Pipeline) Slope(5.4 %) <br />4.0(1) Outlet MinP' (2) <br />. lpe <br /> (Pipeline) Slope(2.5 %) <br />5.6 Outlet(3) Ave. (4.3%) <br /> (Pipeline) <br /> <br />(E) Existing (N) New <br />(1) Capacity exceeds estimated flow since next increment pipe size used. <br />(2) No Surcharging (3) Surcharged - Blowoff to WTP <br /> <br />V-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.