Laserfiche WebLink
<br />FOUR SEASONS TROUT FARM <br />JOHN NIBLACK <br />P,O, Box 21 <br />CEDAREDGE. COLOHADO 81413 <br />(liV)Ql) 856-3029 <br /> <br />F?~ru,ry 7.7,2002 <br /> <br />John N. V~n Sciver <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room721 <br />Denver, CO 80203 <br /> <br />Dear Mr. Van Sciver, <br /> <br />Please find enclosed the information you requested earlier this <br />month. <br /> <br />1. Construction and engineering cost estimates. <br /> <br />$ <br /> <br />38,000.00 <br />27,575.00 <br />16,500.00 <br />13,000.00 <br />2,870.00 <br />97,945.00 <br /> <br />concrete <br />excavation and pipe <br />predator control structure <br />hatchery roof <br />engineering <br /> <br />$ <br /> <br />2. Pred~tor control structure detail. (See page 2.) <br /> <br />3. Pipeline replacement detail. (See page 3 and~4.) <br /> <br />4. Hatchery roof replacement. <br /> <br />A. Both layers of asphalt and wood shingles removed including <br />nails. <br /> <br />...... '~c~1~c8 iif1y Ud!aa~eJ. b~.12d.i...~1.ilJ.,::";. <br />C. Overlay 'Nith 5/8" 0513. <br />O. Install flashing and tar paper. <br />E. Install 29 gauge steel roofing. <br /> <br />5. Existing raceways to rye removed and used as riprap on Tongue <br />Creek. <br /> <br />6. Pond is to remain drained until 3ediment can be removed. <br />Water from new raceways to flow through PVC pipe structure <br />which prevent3 ingress of fish,muskrats etc. (See page 3.) <br /> <br />r~ <br />