My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00177
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:27 AM
Creation date
10/6/2006 12:03:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150110
Contractor Name
Four Seasons Trout Farm
Contract Type
Loan
Water District
40
County
Delta
Bill Number
HB 02-1152
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... . ~... <br /> <br />CWCB Construction Fund Loan Application <br /> <br />rfYES, please explain. <br /> <br />7, Please list the names and addresses of the Applicants' engineer(s) and attomey(s), <br /> <br />NAME <br />Norm Earthal Eng. <br /> <br />ADDRESS and PHONE <br />CDOW, 6060 Broadway, Denver, CO 80216 (303)291-7401 <br /> <br />8, List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Both water sources tested negative for WD. Copies <br /> <br />enclosed. <br /> <br /> .... <br />9. Estimated cost of the project. Please inclulie estimated engineering costs, and estimated <br /> construction costs, if known. <br /> Estimated Engineering Costs: $ 10000 (in progress) <br /> Estimated Construction Costs: $ 100000 <br /> Estimated Total Costs: $ 110000 <br /> <br />10, Loan amount and terms you are requesting. <br /> <br />Requested Loan Amount: $ <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />110000 <br />10 <br /> <br />3 <br /> <br />(Usually 75% of Estimated Total Costs) <br /> <br />vears (Usually 10, 20, or 30 years) <br /> <br />% (Please call for our current rales) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity, It is <br />also requested that the project sponsor submit with this application copies of the two most recent <br />annual reports, financial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />I, List any existing liability or indebtedness that exceeds one thousand dollars, For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc, Include names and <br />addresses of lenders, amounts, due dates and maturity dates, Attach a separate schedule, if <br />needed, <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.