My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00141
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2010 10:41:02 AM
Creation date
10/6/2006 12:03:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150135
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />945-6546 <br />242:"5202 <br />263-2206 <br />248-0600 <br /> <br />-" <br /> <br />CWCB Construction Fund Loan Application <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br /> <br />NAMF AflflRRSS "nO PHnNR <br /> <br />RAI rOMR & C,RFFN. P,C. R1R (010. AVE" GLENWOOD SPRINGS. (0 81601 <br /> <br />WESTERN ENG I NEERS 2150 lJS Hwy 6&50, GRAND JCT" CO 81505 <br /> <br />MUNRO PUMP I NC, 808 S 9TH ST" GRAND JCT" CO 81501 <br />BUREAU OF RECLAMATION, 2764 COMPASS DRIVE, GRAND JeT" CO 81506 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />.progress for the proposed project. Please submit one copy of each completed study with this <br />application. All PRf),IFrTEFAS1RIIITY STIInIFSWIII FOllOW. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br /> <br />Estimated Engineering Costs: $ <br />Estimated Construction Costs: $ <br />Estimated Total Costs: $ <br /> <br />100,000 <br />1.033,000 <br />1. 133 . 000 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ L 019 J 00 <br /> <br />(Usually 75% of Estimated Total Costs) <br /> <br />Term (length) ofloan: <br />Interest Rate: <br /> <br /><;n y""'" (Usually 10,20, or 30 years) <br />? . 7 r:," % (please caUfor our current rates) <br /> <br />*OR LOWER IF AVAILABLE <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB ConstrUction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment Of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application copies of the two most recent <br />annual reports, [mancial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and <br />addresses of lenders, amounts, due dates and maturity dates. Attach a separate schedule, if <br />needed. <br /> <br />:'\ <br /> <br />CFl.A602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.