My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00141
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2010 10:41:02 AM
Creation date
10/6/2006 12:03:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150135
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />b. Install collection measures for each seep area. If the seepage exit conditions <br />can adequately be defined, this might be done after the reservoir is drawn down so <br />that the work could be performed without interference from seepage spray. The <br />collection features might include such items as chipping collection channels in the <br />exposed tunnel rock, installation of pipes, plates, etc. bolted to the tunnel rock and <br />epoxy gfout to seal opening around collection features. <br /> <br />Following is our estimate of the costs associated with this option: <br /> <br />Collection Features <br />Sample Tests <br />25% Contingency <br />Design <br />Inspection/Completion <br /> <br />$20,000 <br />2,000 <br />5,500 <br />4,500 <br />5,000 <br /> <br />T ota! Estimated Cost <br /> <br />$37,000 <br /> <br />Note that the above costs assume that Silt WCD personnel will obtain samples and <br />transport them to the testing laboratory. Sample testing costs are only for the first year. It <br />would be expected that some periodic sampling and testing would be required on a long- <br />term basis. It must also be noted that, if the monitoring indicates the possibility of void <br />development, other methods would 00 required to prevent further void enlargement. <br /> <br />2. It would 00 expected that creation or enlargement of subsurface voids would be <br />accompanied by a reduction in seepage pressures along the seepage paths. Although not as <br />reliable as the collection, measurement and sampling of seepage discharge water discussed <br />above these pressures could be monitored by piezometers. If the seepage path is known <br />with some confidence, so that the piezometers could be installed along that path, the cost <br />for piezometer insta1lation is estimated as follows: <br /> <br />Piezometer Installation <br />25% Contingency <br />Design <br />Inspection/Completion <br /> <br />$15,000 <br />3,750 <br />3,500 <br />6,000 <br /> <br />T ota! Estimated Cost <br /> <br />$28,250 <br /> <br />3. The seepage entty area could be sealed. Unless the entJy area is successfully <br />identified this method would require an informed assumption regarding the location of <br />entty areas. Assuming the previously noted possible seepage entry areas, it is estimated <br />that about 17,000 sq ft of area would need to be sealed. This would cover the area shown <br />as disturbed by spillway excavation on the 1909 enlargement plans extending down to <br />about gage elevation 40 (five feet below the presumed seepage initiation level of 45) as well <br />as extending about 50 feet onto the embankment. This could be accomplished either with <br />placement of a synthetic liner or a compacted clay blanket. The work would consist of the <br />following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.