My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153656 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153656 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:35 AM
Creation date
10/6/2006 12:03:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153656
Contractor Name
Loloff Lateral Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r:"--, <br />. " <br /> <br />~-, ,~ <br />.' <br /> <br />WHEREAS, pursuant to section 1 of chapter 32, Session Laws of Colorado 1987, as <br />amended by HB 93 1273, the State has been authorized to loan Seventy-One Thousand Five <br />Hundred Dollars ($71,500) for construction of the project. <br /> <br />WHEREAS, the Contractor or Borrower understands that this Contract is also a <br />promissory note for the repayment of funds loaned to the Borrower according to the terms <br />set forth herein. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants herein <br />contained, it is agreed by the parties hereto as follows: <br /> <br />A. The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm (hereinafter referred to as the Consultant) to prepare <br />project plans and specifications for the project. Both the Consultant and the project plans <br />and specifications must be approved in writing by the State before construction on the <br />project can commence. For purposes of this paragraph, "construction" includes any real <br />estate and water rights acquisitions. <br /> <br />2. Contract for the construction of said project to a responsible and capable firm or <br />firms (hereinafter referred to as Construction Firm or Firms), which Construction Firms <br />shall be selected by the Contractor through competitive public bidding. The State must <br />approve in writing all contracts before they can become effective. <br /> <br />3. Cause construction of the project to be completed within two (2) years of the date <br />of this contract, in accordance with the project plans and specifications and any necessary <br />modification(s) thereof approved by the State. This time may be extended by the State in <br />writing if such time is insufficient because of acts of God or other acts or circumstances <br />beyond the control of the Contractor. The Contractor must produce documented <br />justification of any such acts or circumstances. <br /> <br />4. Require all Construction Firms and their subcontractors to indemnify the State and <br />the Contractor against all liability and loss, and against all claims and actions based upon <br />or arising out of damage or injury, including death, to persons or property, caused by any <br />acts or omissions of those parties or sustained in connection with the performance of any <br />contract related to the project or by conditions created thereby, or based upon any violation <br />of any statute, ordinance, or regulation, and the defense of any such claims or actions. <br /> <br />5. Require all Construction Firms and their subcontractors to maintain during the term <br />of their contracts for project construction the following: <br /> <br />a. Workmen's compensation and employers' liability insurance in the required <br />statutory amounts. <br /> <br />Page Z of 11 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.