My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153656 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153656 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:35 AM
Creation date
10/6/2006 12:03:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153656
Contractor Name
Loloff Lateral Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UNITED STATES <br />DEPARTMENT OF <br />AGRICULTURE <br /> <br />SOIL <br />CONSERVATION <br />SERVICE <br /> <br />, ~l.L-~'~~ .: ."'. <br />.u- .A. ~..," <br />:\,r ~ ,_, <br />RECEIVED \0, <br />OCT l7 1994 t:: \ <br />AREA OFFICE '::-', <br />2343 27TH ST. #506~ CWC~ J'; <br />GREELEY. CO 80631 IS' ,'I <br /> <br /> <br />..) <br /> <br /> <br />October 3, 1994 <br /> <br />Mike Serlet <br />Colorado Water Conservation Board <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Dear Mr. Serlet: <br /> <br />This letter is in response to your request for verification <br />of PVC pipe increases since 1992, the year Lo1off Lateral <br />Ditch Company applied for a loan. According to Doyle Hestor <br />with Diamond Pipe the price of PVC pipe has risen 15-20 <br />percent since 1992. <br /> <br />The cost for 18" and 15" pipe was $15.56/linear ft. and <br />$8.87/linear ft. respectivelY on the preliminary estimate <br />for Loloff Lateral in 1992. Increasing these costs by an <br />average of 18 percent the cOpt for 18" and 15" pipe would be <br />$18.36/1inear ft. and $10.47!linear ft. respectively. These <br />costs reflect the cost per linear foot seen on the recent <br />bids for the construction of the Lo1off Lateral Pipeline. <br /> <br />Please do not hesitate to co~tact Glenn Newlon or myself if <br />you have any questions. <br /> <br />/0 <br />/l...-' <br /> <br />'I-/.5~ ~~ <br /> <br />Sincerely, <br /> <br />1&?a,~-o <br /> <br />Rosanna Leos, <br />Staff Engineer <br /> <br />Pipe Old New Price Pipe Total <br />Size Price Price Increase Lengtl1 Increase <br />15" 15.56 18.36 2.80 7,025 19,670 <br />18" 8.87 10.47 1.60 2,7511 4,406 <br /> S 24,076 <br /> <br />APPENDIX B <br />
The URL can be used to link to this page
Your browser does not support the video tag.