My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00092
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:34 AM
Creation date
10/6/2006 12:02:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153507
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />construction on the water projects. <br />Subsequent payments shall be due and payable <br />on January 1st of each year thereafter. <br /> <br />4. The Contractor repayment to the State of the <br />Twenty-Six Thousand Six Hundred Forty Dollars <br />($26.640) proportionate cost-share for the <br />Comanche Dam. as previoUSly required by Paragraphs <br />5. and 6. of the Original Contract. shall be <br />included as part of the Contractor repayment of <br />the rehabilitation loan to be required by the <br />proposed Project Contract. <br /> <br />5. A fully executed Project Contract between the <br />State and the Contractor for a loan to <br />rehabilitate the Comanche Dam is a condition <br />precedent to this Contract Amendment. The <br />repayment provisions of that Project Contract <br />shall include repayment to the State of the <br />Twenty-Six Thousand six Hundred Forty Dollars <br />($26,640) proportionate cost-share provided by the <br />State for the feasibility report of Comanche Dam. <br />This Contract Amendment shall not be effective <br />until such Project Contract has been fully <br />executed by the signatures of all parties. and has <br />obtained all required approvals thereof. including <br />that of the Attorney General and the Controller. <br />and a conformed copy of such signed and approved <br />Project Contract returned to the parties thereto. <br /> <br />. <br /> <br />/ <br /> <br />Page 1 of ~ Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.