My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00092
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:34 AM
Creation date
10/6/2006 12:02:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153507
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,; ;/l"""'.~? / <br />J?(Lt/~'>'k!'<'; ,\; <br />(It; ;;'<-7..; ')" <br />e /~: ~;t,.I X"" tY] <br /> <br />C'<~ <br />. , <br />r -~ <br /> <br /> <br />No ad <br /> <br />FEASIBILITY REPORT <br />CONTRACT AMENDMENT <br /> <br />THIS CONTRACT. made this/? 'if;,. day of ~ ..t-Lu.._~ <br />Slale of Colorado for fhe use and benefit of file Department of 0\ ~ural <br />(Colorado Water Conservation Board) , <br />he'ein~fte.r Tl'ferred 10 as the Slate. and '2 the City of Greeley, <br />C~VlC Center Complex, 919 7th St., Greeley, CO 80631, <br />hereinafter referred 10 as lhe contraclor IContractor. <br /> <br />198 .~ . by and between the <br />Resourcp-s <br /> <br />WHEREAS. Hllthorily exisl~ in the law and Funds have been budgeted. appropriated and otherwise made <br />availllhle lInd a sufficient unencumbered balance thereof remains available for payment in Fund Number 4008 <br />G/L Account Number 5274X, Contract Encumbrance NumberC153467: and ' <br />ABL Account Number 12740, Org. Unit 77-77-777, <br />.WHEREAS. required approval. cle::ar:lnl.:e and coordination ha~ been accomplished from and with appropriate <br />agenCIes; and <br /> <br />. <br /> <br />WHEREAS. a contract was entered into on July 1. 1986. <br />Contract Encumbrance Number C153467 (the Original Contract). <br />between the State and the Contractor; and <br /> <br />WHEREAS. the Original Contract provided. that the State <br />would pay fifty percent (50\) of the cost for the Contractor to <br />conduct feasibility studies for the rehabilitation of three <br />dams; namely. Comanche Dam. Peterson Dam and Twin Lakes Dam. <br />Fifty Percent (50\) of that cost is Sixty-Eight Thousand Five <br />Hundred Sixty Dollars ($68,560). as shown by Exhibit B of the <br />Original Contract: and <br /> <br />WHEREAS. Paragraphs 5. and 6. of the Original Contract <br />provided that the Contractor would repay the State Eighty-Eight <br />Thousand Seven Hundred Eighty-Five Dollars and Twenty Cents <br />($88.785.20) in ten (10) equal annual payments of Eight <br />Thousand Eight Hundred Seventy-Eight Dollars and Fifty-Two <br />Cents ($8.878.52) each if the rehabilitation of the three dams <br />was initiated within ten (10) years of the effective date of <br />the Original Contract; and <br /> <br />WHEREAS. the repayment provisions .of Paragraphs 5. and 6. of <br />the Original Contract were intended by the parties to apply in <br />a proportionate cost amount to any part of the three dam water <br />projects. as long as the rehabilitation of such part is <br />initiated within the specified time; and <br /> <br />WHEREAS. the total repayment to the State of Eighty-Eight <br />Thousand Seven Hundred Eighty-Five Dollars and Twenty Cents <br />($88,785.20) was derived by adding a five percent (5\) per <br />annum service charge to the fifty percent (50\) State payment <br />of Sixty-Eight Thousand Five Hundred Sixty Dollars ($68.560) <br />for preparing the three feasibility reports. which fee is shown <br />in Exhibit B of the Original Contract; and <br /> <br />WHEREAS~ the Contractor desires to enter into a Project <br />Contract with the State at this time to proceed with the <br />rehabilitation of the Comanche Dam only. The initiation of <br />this Comanche Dam rehabilitation would activate the repayment <br />provisions of Paragraphs 5. and 6. of the Original Contract for <br />repayment by the Contractor to the State of a proportionate <br />cost amount provided by the State for the Comanche Dam; and <br /> <br />I WHEREAS. the proportionate share of the Eighty-Eight <br />Thousand Seven Hundred Eighty-Five Dollars and Twenty Cents <br />($88.785.20) for the Comanche Dam feasibility report is <br />Thirty-Four Thousand Four Hundred Ninety-Eight Dollars and <br />Eighty Cents ($34.498.80). This amount of Thirty-Four Thousand <br />Four Hundred Ninety-Eight Dollars and Eighty Cents ($34.498.80) <br /> <br />395-:5M1-1(lJ4 <br /> <br />Page I of-2-pages <br />*{Sccinsuucliunson Icver.re of last page.) <br /> <br />5315E <br /> <br />APPEN[JIX A.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.