My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00092
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:34 AM
Creation date
10/6/2006 12:02:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153507
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />f"'~ <br /> <br />( <br /> <br />~~ <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />',~ <br /> <br />,~- <br /> <br />1. Board approval of eng ineering firm and eng ineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Englneerts <br />office) . <br /> <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction, <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />7. <br /> <br />Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction' on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />The consulting eng,ineer certifies that the project has ' <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />8. <br /> <br />9. <br /> <br />10. <br /> <br />Submittal of as-built drawings to Board staff for <br />approval and fil ing. <br /> <br />.-<..' <br /> <br />',,,, <br /> <br />. . ::,:-~~~~.~t.,:/,,- .- <br /> <br />EXHIBIT B <br /> <br />102 <br />schedl a <br /> <br />-- <br />,n..;'. <br /> <br />...:b..,,,:!,,..... <br /> <br />" .'_;:",,~, ,,_C'_' "_. ..-,,: " _..... . <br /> <br />., <br /> <br />" <br /> <br />-~ <br />---- <br /> <br />----.- <br /> <br />-----.. <br />~~--.....-......~. <br /> <br /> <br /> <br />",.;, <br /> <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.