My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00092
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:34 AM
Creation date
10/6/2006 12:02:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153507
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J <br /> <br />~'''''''''''''~........, <br /> <br />,. <br /> <br />-', <br /> <br />.~ <br />, <br /> <br />... <br /> <br />management. operation. and maintenance. The Contractor agrees <br />to indemnify and hold the State harmless from any liability as <br />a result of the State's interest in the project facilities and <br />any other property identified in paragraph A.5. above. The <br />Contractor shall maintain general liability insurance covering <br />the management. operation. and maintenance of the project until <br />it completes repayment to the State in at least the fOllowing <br />amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence. the sum of Five Hundred Thousand Dollars <br />($500.000). <br /> <br />b. For any injury to two or more persons in any <br />single occurrence. the sum Of One Million Dollars <br />($1,000.000). <br /> <br />-- <br /> <br />Said liability insurance for this project shall name the State <br />as a co-insured. A copy of a certification of said liability <br />insurance or evidence that the Contractor can provide the <br />specified insuranoe coverage through a self-insurance program <br />must be filed with the Colorado Water Conservation Board prior <br />to the start of the operation of the project system. <br /> <br />8. Make the services of said project available within its <br />capacity and in accordance with its rules and regulations. and <br />operational guidelines. to all persons in the Contractor's <br />service area without discrimination as to race. color. <br />religion. or national origin at reasonable charges (including <br />assessments. taxes. or fees), whether for one or mor~ classes <br />of service. in'accordance with a schedule of such charges <br />formally adopted by the Contractor through its City Council, as <br />may be modified from time to time. The Contractor hereby <br />states and affirms that the rate schedule adopted by the Water <br />and Sewer Board a~d the City Council in accordance with the <br />Charter of the City of Greeley must and shall provide for the <br />generation of sufficient revenues for: (1) the operation and <br />maintenance of the water system; (2) debt service requirements <br />including repaymeht of the project loan authorized by this <br />contract: and (3) additions to a reserve account to offset <br />depreciation to the water system. The Contractor may make such <br />modification to the rate schedule as the Contractor 6eems <br />necessary to efficiently and economically provide for the <br />financial requirements of the system. The rate schedule shall <br />remain reasonable and non-discriminatory. <br /> <br />-"""'-- <br />---~ <br /> <br />9. Adjust its operating costs and service charges from <br />time to time to provide for adequate operation and maintenance. <br />emergency repair services. obsolescence reserves. and debt <br />reserves. <br /> <br />10. Provide the State with such periOdic reports as the <br />State may require and permit periOdic inspections of its <br />operations and accounts by a designated representative of the <br />State, <br /> <br />11. Repay to the State the total project loan principal <br />for the design. and construction of this project. in the amount <br />of Eight Hundred ThirtY-Five Thousand Eight Hundred Sixty <br />Dollars ($835,860), together with the amount of Twenty-Six <br />Thousand Six Hundred Forty Dollars ($26.640) previously <br />advanced by the State for the feasibility study of Comanche <br />Dam. for a total principal repayment cost not to exceed Eight <br />Hundred Sixty-Two Thousand Five Hundred Dollars ($862.500). <br />plUS accumulated interest calculated using accepted accounting <br />prinCiples at a rate of five percent (5') per annum. said <br />repayment to be made in constant annual installments. <br /> <br />Page 1 of ! Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.