My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00092
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:34 AM
Creation date
10/6/2006 12:02:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153507
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J <br /> <br />J <br /> <br />--~ <br />~- <br />~- <br /> <br />------- <br /> <br />,:.,::-:.~ <br />;,;...... <br /> <br />---. <br /> <br />". 'i;;~~f~~~~}.:' <br /> <br />.~_. <br /> <br /> <br />'F~'_A_" <br />WFRPB <br /> <br />/..., <br /> <br />-/ <br /> <br />PROJECT <br />CONTRACT <br />-tW <br />THIS CONTRACT, made ,his /7 day of <br />State of Colorado for the use and benefit of the Department of " <br />(Colorado Water Conservation Board) , <br />hereinafter ft"(erred to as the Slale, and '2 the Ci tv of Greeley, <br />~r~elev Civic Center. Greelev. CO 80631. <br />hereinafter refemd to as the contractor/Contractor. <br /> <br />$835,860 <br /> <br />198 ~ . by and between the <br />atural Resources <br /> <br />WHEREAS. authority exists in the Law and Funds have bttn budgeted. appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains ('ilahle for faymeRt in fund Number 4008 , <br />elL Account Number 5361X. Contract Encumbrance Number ' ifl..':;I){) ; and <br />ABL Account Number ~, Org. Unit 77-77-777, <br />WHEREAS. required approval. clearance and coordination has been accomplished from and with appropriate <br />agencies: and <br /> <br />WHEREAS. pursuant to the provisions of 37-60-119. Colorado <br />Revised Statutes. the State is authorized to loan money for the <br />construction of water projects for the benefit of the people of <br />the State; and <br /> <br />WHEREAS. the Contractor is a duly constituted City in the <br />State of Colorado and wishes to construct. or cause to be <br />constructed. the enlargement and rehabilitation of its Comanche <br />Dam and appurtenant structures. hereinafter called the project. <br />which is located in Larimer County. Colorado. at an estimated <br />cost of One Million Seven Hundred Twenty-Five Thousand Dollars <br />($1.725.000); and <br /> <br />WHEREAS. a feasibility investigation of said project was <br />conducted and it was found that such a project is teChnically <br />and financially feasible; and <br /> <br />WHEREAS. the State has now agreed to loan money for the <br />construction of said project upon mutually agreeable terms and <br />conditions. subject to the availability of funding for that <br />purpose: and <br /> <br />WHEREAS. pursuant to Senate Bill No. 15. Fifty-sixth <br />General Assembly of the State of Colorado. duly enacted into <br />law. the Colorado Water Conservation Board has been authorized <br />to loan a SUm not to exceed Eight Hundred Sixty-Two Thousand <br />Five Hundred Dollars ($862.500) for the feasibility report and <br />the construction of the project; <br /> <br />WHEREAS. the Contractor desires to include the repayment of <br />the sum of Twenty-Six Thousand Six Hundred Forty Dollars <br />($26.640). previOUSly advanced by the State for the feasibility <br />study of Comanche Dam. in its repayment of the loan of Eight <br />Hundred Thirty-Five Thousand Eight Hundred Sixty Dollars <br />($835.860) made under this contract for a total principal <br />repayment of Eight Hundred sixty-Two Thousand Five Hundred <br />Dollars ($862.500); <br /> <br />NOW. THEREFORE. in consideration of the mutual and <br />dependent covenants herein contained. it is agreed by the <br />parties hereto as follows: <br /> <br />A. The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm to prepare project plans and <br />specifications for the project. Both the engineering firm and <br />the project plans' and specifications must be approved by the <br />State before initiation of construction on the' project. <br />including any real estate and water rights acqUisitions. can <br />commence. <br /> <br />395-:5J.<n-1014 <br /> <br />Page I of ~ pages <br />-(See ins!ruclions on reverse of lul page.) <br /> <br />4321E <br />
The URL can be used to link to this page
Your browser does not support the video tag.