Laserfiche WebLink
<br />,'-' 0 r <br />".-~ ~o\ ,_ , <br />ITHOMAS] ~gll\e{l'{[l\g 91\C. <br /> <br />I <br /> <br />432 NORTH BROADWAY <br /> <br />"CORTEZ, COLORADO 81321 <br /> <br />PHONE: 303-565-7805 <br /> <br />December 19, 1977 <br /> <br />To: <br />Economic Development Administration <br /> <br />Re: <br />Federal Project No. 05-72-26250 <br /> <br />Gentle.llen: <br /> <br />The sealed bids for the To,m of Rico Water System Improvement <br />Federal I'roject No. 05-72-26250 \-Iere opened and read publicly by Mayor <br />Jack Curran before the Town Board on Thursday, December 15, ~977, at <br />5:00 P.M, before me, bidders and various interested parties. Enclosed <br />herel-lith is a copy of the tabulation of bids and the Engineer's Estimates. <br />This tabulation has been checked for mathematical errors and completion <br />and found to be in order. All bid bonds of Contractors tabulated herein <br />were in order. <br /> <br />In Schedules I, II, V, VII and VIII, there was only one bid submitted. <br />Since the prices on these items were so high, I recommend that no award be <br />made. <br /> <br />In Schedules II - Tank and VI - Tank <br />received, the lowest being American Steel <br />A complete copy of this bid is enclosed. <br />be accepted. <br /> <br />sandblasting, three bids were <br />and Iron of Denver, Colorado. <br />I hereby recommend that this bid <br /> <br />In Schedule IV - Intake, no bid was received. <br /> <br />I recorrunend that Items I, II, IV and V be readvertised for bid opening <br />the first week in February. <br /> <br />In compliance with Paragraph 61 of the General Conditions (10% l1inority <br />Enterprise Participation);, we are anticipating a minority bid on Item V, <br />~!hich is an infiltration '~el. A new firm of American Indian miners has <br />expressed a sincere inter~~t in this project and will submit a bid if \-Ie <br />readvertise as suggested herein. The Engineer's Estimate of this portion <br />of the project is $89,150.00, which is 25 percent of the total project. <br />The firm, Yellm.'ll1an and Son, failed to bid the first opening because they <br />were unable to get their bid together before the December 15 bid opening <br />date. <br /> <br />A:;k <br /> <br />rredric P. Thomas, PE-LS <br /> <br />FPT :nt <br /> <br />Enclosures <br /> <br />CC: TOHn of Rico <br />Far;ners Ho;;-,e .I,dministration <br />Colorado \':E:.l" er CC:1S er-vation Board <br />