Laserfiche WebLink
<br />..."'" ,,-^...-u~ In. ~/O~J <br /> <br />EXHIBIT A <br /> <br />DEP,4 <>TMENT OR AGENCIr' NUMB Ell <br />,-04-00 <br />CONTRACT OUTING NUMBER <br />1&1 0 <br /> <br />'NOFPB <br /> <br />FEASIBILITY REPORT <br />CONTRACT <br /> <br />$74,000 <br /> <br />THIS CONTRACT. made this 15th day?f August <br />Stale of Colorado for the,. use and benefit of the Department of . 1 <br />(Colorado Water Conservation Board) , <br />hereinafter referred to as the State, a~d '2 _PRC Eng1neer1ng, Denver Tecnolog~ca1 <br />Center, Bldg. 40 West, 7935 E. Prent1ce Ave., Englewood, CO 80111 <br /> <br />198 ~ . by and between the <br />Natural Resources - <br /> <br />hereinafter referred to as the contractor. <br /> <br />WHEREAS. authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />available and a sufficient une.ncumbered balance thereof remains a~i1aQ:!;~payment in Fund Number 4008 <br />G/L Account Number ~2X. Contract Encumbrance Number If'),;} : and <br />ABL Account No. jZ7~, Org. Unit 77-77-777, '. <br />WHEREAS, re4uired approval. c1eara!"ce :md coordination has been accomplished from and ~ith appropriate <br />agencies: and' - <br /> <br />WHE~EAS., pursuant to the provisions of section 37-60-119, <br />Colorado Revised Statutes, as amended, the State is authorized to <br />construct certain water projects for the benefit of the people of <br />.the State of Colorado; and <br /> <br />WHEREAS, the Grand Mesa Water Conservancy.District has made <br />application to the State for the improvement of its existing <br />facility, such improvement of the facility is hereinafter <br />sometimes referred to as the project i and.. <br /> <br />WHEREAS, the Contractor was selected in accordance with the <br />provisions of 24~30-l40l, et s~q., Colorado Revised Statutes <br />1982, and the Contractor has executed the Certificate attached <br />hereto as Exhibit B, which provisions are incorporated, hereip by <br />reference, pursuant to 24-30-1404, Colorado Revised Statutes <br />i9B2; and <br /> <br />WHEREAS, the Contractor is ~ professional engineering firm <br />within the State of Colorado; <br /> <br />NOW THEREFORE, it is hereby agreed that: <br /> <br />1.. The Contractor shall pr'epare a feasibility report <br />directed to the problem of improving the facilities of the <br />Grand Mes~ Water Conbervancy District in accordance with a <br />proposal- .for a.- project feasibility report prepared by him <br />and 'approved by the State, received August 12, 1985, 'which <br />propos~l is attached heretq as Exhibit C and made a part of this <br />contract. <br /> <br />. \ 2. Fifteen (15) copies of the final report called for in <br />~his contract shall be furnished to the State' not later, than <br />Feb. 3 Jafl~aEl 12, 1986, unless such time is extended by mutual <br />~ agreement of the parties hereto in writing. <br /> <br />3. As compensation for the services of the Contractor, the <br />State shall pay to the Contractor the sum of Seventy~Four <br />Thousand Dollars ($74,000) in the manner fOllowing: <br /> <br />a. Sixty percent (60%), to wit, Forty-Four Thousand Four <br />Hundred Dollars ($44,400) of the total 'amount due in two <br />(2) monthly installments of Twenty-Two Thousand Two <br />Hundred Two Dollars ($.22,200) each, commencing on <br />October 1, 1985, <br /> <br />b. The remaining forty percent (40%), to wit, <br />Twenty-Nine Thousand Six Hundred Dollars ($29,600) <br />within forty (40) days following receipt and acceptance <br />of the written report specified in para9raph 2 of this <br />contract. <br /> <br />EXHIBIT A <br /> <br />395-53{)H014 <br /> <br />4' <br />Page I of_pages <br />*(Scc instructions on reverse of last page.) <br /> <br />318 <br />pre <br />