My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00024
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:47 AM
Creation date
10/6/2006 12:02:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153446
Contractor Name
Grand Mesa Water Conservancy District
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. <br /> <br />TASK NO.: 7 <br />RFP CROSS~REFERENCE: <br />Step 2,ltem (3) <br /> <br />STAFF MEMBERS RESPONSffiLE: <br />Hydraulics Specialist <br />Dam Evaluation Specialist <br />System Operation Studies Specialist <br /> <br />.. <br /> <br />. TASK TITLE: <br /> <br />Identification .of Modifications of the Existing Overland Ditch and Reservoir <br />.System Necessary to Accommodate Transbasin Diversions. <br /> <br />RATIONALE: <br /> <br />Enlargements and improvements of the existing Overland Ditch and/or <br />Reservoir required to accommodate the excess flows available for transbasin <br />diversion to the Surface Creek basin need to be 'determined by means of <br />integrated analyses of the hydraulic design of the ditch and the operation of <br />the reservoir. . <br /> <br />METHODOLOGY: <br /> <br />1. Prepare a large-scale location map 01 the existing Overland Ditch and <br />Reservoir system on a base prepared by photo-reproduction of 1 :24,000 scale <br />USGS topographic sheets. <br /> <br />2. Ident.ify the physical characteristics of the di~ch and reservoir and confirm <br />their condition, capacities and other characteristics by field inspection. <br /> <br />3. Perform' a hydraulic analysis of the existing ditch system to determine the <br />size of ditch necessary to carry the system demands plus the excess flows <br />identified in Task No~ 6 available for diversion to the-Surface Creek basin. <br /> <br />4. Using an available reservoir operation computer program, operate the Over- <br />land Reservoir model to determine the live capacity' required to regulate the <br />optimum system supplies plus the estimated excess supplies available for <br />trans basin diversion. <br /> <br />PRODUCTS: <br /> <br />1. Location map of existing Overland Ditch and Reservoir syste'm. <br /> <br />2. Tabulation of present actual operating capacities of components of existi"ng <br />, system. <br /> <br />3. List of enlargements and improvements of components of the existing 'system <br />required to accommodate the estimated excess supplies available for trans- <br />basin diversion. <br /> <br />11-16 <br /> <br />i\ <br /> <br />/ <br /> <br />/ <br />:,,/ <br /> <br />\ <br /> <br />/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.