My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00024
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:47 AM
Creation date
10/6/2006 12:02:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153446
Contractor Name
Grand Mesa Water Conservancy District
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />TASK NO.: 6 <br />RFP CROSS-REFERENCE: <br />Step 2, Item {2} <br /> <br />STAFF MEMBERS RESPONSIBLE: <br />Hydrologist <br />System Operation Studies Specialist <br />qam Evaluation Specialist <br /> <br />.. <br /> <br />TASK TITLE; <br /> <br />Estimate of E"cess Water Supplies in the Overland Ditch and Reservoir <br />System Available for Transbasin Diversion. <br /> <br />RATIONALE: <br /> <br />To estimate the gross inflows available for diversion by the Overland Ditch <br />and Reservoir system and the resulting water supplies excess to the demands' <br />of the sys'tem and potentiaJly available for transbasin diversion to' the Surface <br />Creek basin a computer simulation of the hydrologic operation of the system <br />must be conducted. <br /> <br />METHODOLOGY: <br /> <br />1. Evaluate the results of. Task No. 5 to determine whether excess water <br />supplies are available under existing operation of the OyerIand Ditch and <br />Reservoir system and/or whether additional water could be made available <br />through. improved management, if opportunities for such were identified, for <br />diversion to the Surface Creek basin. <br /> <br />2. Review the physical storage restrictions presently imposed on Overland Dam <br />by the State Engineer and the status of proposed reconstruction or replace- <br />ment of the dam on the basis of information obtained in Sub-Task No. 5.6. <br /> <br />3. Determine the r110st probable future plan for Overland barn, viz. its operating <br />capacity and location. <br /> <br />4. Prepare a compllter simulation model of the Hubbard Creek and Muddy Creek <br />basins and operate for the 15-year study period on a monthly basis" under the <br />proposed future operating conditions to determine the gross water supplies <br />available to the Overland Ditch and Reservoir ~ystem. <br /> <br />5.. Combine and evaluate the results of Steps I and ,4 above with regard to <br />supplies required for utilization in the Overland Ditch system under the <br />selected level of improved management identified in Task No.5 to estimate <br />the g~oss water supplies available for diversion to the Surface Cre~k basin. ' <br /> <br />Il-14 <br /> <br />/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.