My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00024
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:47 AM
Creation date
10/6/2006 12:02:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153446
Contractor Name
Grand Mesa Water Conservancy District
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />~ <br /> <br />TASK NO.: 3 <br />RFP CROSS-'REFERENCE: <br />Step 1, Item (2) <br /> <br />.' <br /> <br />STAFF MEMBERS RESPONSIBLE: <br />Water Rights Specialist <br />System Operation Studies Specialist <br />Irrigation Specialist, <br /> <br />TASK TITLE: <br /> <br />Analysis of Potential Water Rights Exchanges in Surface Creek Wate~, Supply <br />System. . <br /> <br />RATIONALE: <br /> <br />Using the water rights and historic water availability data developed in Task <br />No.2, a detailed analysis of the existing water supply system in the Surface <br />Creek basin is required .to determine the amounts and locations to which <br />replace,ment'exchanges of water must be delivered to permit upstream junior <br />rights to divert out of priority. <br /> <br />METHODOLOGY: <br /> <br />1. Identify the reiative priorities of water users in the Surface Creek Water <br />System; the extent each has historically been able to obtain water, anc! the <br />willingness of the individual senior rights, to participate in a basin-wide <br />system management plan involvi.ng exchanges. <br /> <br />2. Modify the basin simulation rno"del developed in Sub-Task No. 2.11 and <br />operate the basin model under the imp'roved managemeT)t conditions <br />identified in Sub-Task No. 2.12 to determine quantities and timing of releases <br />from storage required as replacement for out-of-priority diversions by <br />upstream junior rights. <br /> <br />PRODUCTS'-- <br /> <br />1. List of senior water rights and schedule of replacement exchanges required <br />for each to permit upstream junior rights to obtain a full supply. <br /> <br />\ <br /> <br />/ <br /> <br />lI-IO <br />
The URL can be used to link to this page
Your browser does not support the video tag.