Laserfiche WebLink
<br />'. <br /> <br />; <br /> <br />':', <br />.,'. <br /> <br />". <br /> <br />'.;" <br /> <br />{,' <br /> <br />{::~ ,'. <br /> <br />.....~ . <br /> <br />,',.,' <br /> <br />. . <br /> <br />. :,;":/ <br /> <br />,. <br /> <br />, <br /> <br />',' <br /> <br />'I <br /> <br />EXHIBIT B <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering fim and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />Office) . <br /> <br />4. <br /> <br />Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />s. <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />a. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />7. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and filing. <br /> <br />EXHIBIT B <br /> <br />102 <br />schedl a <br />