<br />~ <br />~ <br /> <br />work will proceed from the east to the west. Significant <br />dewatering of the construction site will proceed initially. The <br />eastern outlet works will replaced with a new outlet works to be <br />located approximately 100 feet north of the existing outlet <br />works, in order to eliminate an existing bend in the ditch as it <br />exits the outlet works. Vegetation will be removed and the site <br />will be excavated to expose the existing siphon. The existing <br />siphon will be removed and replaced with 48 inch reinforced <br />concrete pipe. A section of the existing 400 foot section will <br />be exposed and the boiler pipe will be inspected for its <br />structural integrity. Based on this analysis, the 48 inch pipe <br />will either be 'joined to the existing 42 inch boiler pipe or the <br />42 inch boiler pipe will be removed and replaced with 48 inch <br />reinforced concrete pipe, The inlet works may be replaced <br />depending on whether the 42 inch boiler pipe needs to be <br />replaced. <br /> <br />Alternative Designs and Construction Cost Estimates are found in <br />Appendix C. <br /> <br />Water Rights <br /> <br />The decreed water rights for the Las <br />Consolidated Extension Canal Company <br />Ditch Co. Appropriation Date <br />LACC April 10, 1875*1 <br />CEXT March 7, 1884 <br />LACC December 3, 1884*2 <br />LACC March 13, 1888 <br />CEXT April 15, 1909 <br /> <br />i <br /> <br />Animas Consolidated <br />are listed below: <br />Flow in cfs <br />22.30 <br />5.50 <br />22.00 <br />80,00 <br />44,80 <br /> <br />and <br /> <br />*1 Transferred to Catlin Canal <br />*2 Catlin decree transferred to LACC headgate <br /> <br />The State Engineer'S Office Annual Water Diversion Reports for <br />1994 and 1995 are found in Appendix D. <br /> <br />7 <br />