Laserfiche WebLink
<br />~" <br /> <br />) <br /> <br />"l~, ,;..' <br /> <br /> <br />. -\;~f1~\1 <br /> <br /> <br />FEASIBILITY REPORT' <br />CONTRACT AMENDMENT <br /> <br />THIS CONTRACT. mad. thl.L 71t d.y .r h ,,(.1..., -~ <br />Slale or Colorado for Ihe U5e and bet'lefil or Ihe Drpar.mcnl or . I U r a 1 <br />(Colorado Water Conservation Board) , <br />hereinarter n'femd 10 as Ihe SIRle. alld.2 the ci tv of Greeley, <br />Civic Center Comple~, 919 7th st., Greeley, CO <br />hereina'ler rererred 10 as Ihe conlraclor IContractor. <br /> <br />198 t. . by and between Ihe <br />Rp-gnurceg <br /> <br />80631, <br /> <br />WHEREAS. allthorily ulsls In the Law and Funds have been budgeled. apflroprill.ed and 0lherwi5e made <br />IVAilable and a 5urnclenl unencumbel'td balance lhereor remains available 'or paymenl in Fund Number 4008 <br />GlL Aeenun. Number 5274X. Contrael Encumbrance NtlmberC153467: and <br />ABL Account Number l2740, Org. unit 77-77-777, <br />WHEREAS. rC1luircd appruVllt. ~ lInd enordinalinn ha~ been accomplished from and with appropriate <br />'lendes: IInd <br /> <br />WHEREAS, a contract was entered into on July 1. 1986. <br />Contract Encumbran~e Number C153467 (the original Contract). <br />between the State ~nd the Contractor: and <br /> <br />WHEREAS. the Otiginal Contract provided. that the State <br />would pay fifty percent (50\) of the cost for the Contractor to <br />conduct feasibility studies for the rehabilitation of three <br />dams: namely. Coma~che Dam, Peterson Dam and TWin Lakes Dam. <br />Fifty Percent (50\) of that cost is Sixty-Eight Thousand Five <br />Hundred Sixty Dol14rs ($68.560), as shown by Exhibit B of the <br />Original Contract; and <br /> <br />WHEREAS. Paragtaphs 5. and 6. of the original Contract <br />provided that the tontractor would repay the State Eig~ty-Eight <br />Thousand Seven Hun~red Eighty-Five Dollars and TWenty Cents <br />($88,785.20) in ten (10) equal annual payments of Eight <br />Thousand Eight Hun~red Seventy-Eight Dollars and Fifty-TWo <br />Cents ($8,878.52) ~ach if the rehabilitation of the three dams <br />was initiated withtn ten (10) years of the effective date of <br />the Original Contr<<ct; and <br /> <br />WHEREAS. the r~payment provisions of Paragraphs 5. and 6. of <br />the Original Contr~ct were intended by the parties to apply in <br />a proportionate COst amount to any part of the three dam water <br />projects, as long <<s the rehabilitation of such part is <br />initiated within the specified time: and <br /> <br />WHEREAS. the total repayment to the State of Eighty-Eight <br />Thousand Seven Hun~red Eighty-Five Dollars and TWenty Cents <br />($88,785.20) was derived by adding a five percent (5\) per <br />annum service charge to the fifty percent (50\) State payment <br />of Sixty-Eight Thousand Five Hundred Sixty Dollars ($68.560) <br />for preparing the three feasibility reports. which fee is shown <br />in Exhibit B of the Original Contract; and <br /> <br />WHEREAS; the Contractor desires to enter into a Project <br />Contract with the State at this time to procsed with ths <br />rehabilitation of the Comanche Dam only. Ths initiation of <br />this Comanche Dam rehabilitation would activat.e the repayment <br />provisions of Paragraphs 5, and 6. of the Original Contract for <br />repayment by the Contractor to the State of a proportionate <br />cost amount provided by the State for the Comanche Dam: and <br /> <br />WHEREAS. the Proportionate share of the Eighty-Eight <br />Thousand Seven Hunared Eighty-Five Dollars and Twenty Cents <br />($88.785.20) for the Comanche Dam feasibility report is <br />Thirty-Four Thousand Four Hundred Ninety-Eight Dollars and <br />Eighty Cents ($34d98.80). This hmount of Thirty-Four Thousand <br />Four Hundred NinetY-Eight Dollars and Eighty Cents ($34.498.80) <br /> <br />39S<tl<l1-io-M <br /> <br />PUle I or..2.... pages <br />-CStelnSI,utti"nsl,ln,e"e'seurlasl pile.) <br />APPENDIX A <br /> <br />SJlSE <br />