Laserfiche WebLink
<br />10. <br /> <br />':''':;c,~.(q...:' <br /> <br />.El>ULE A <br />COLORADO WATER CONseRVATION nOARl> <br /> <br />CONSTRUCTION FUND PROGRAM PRoceDURES <br /> <br />. <br /> <br />I <br />1. Doard approval of engineering firm and engineering <br /> <br />agreement between engineering [Irm and project sponsor. <br /> <br />2. Preparation of detailed plans and speclClcatlons Co[ <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and speclClcatlons Cor storage dams and <br />reservoirs must also be approved by State Engineet's <br />office). <br /> <br /> <br />4. Doatd staCf apptoval of bidding for the project. Doard <br />staff present at bid opening for construction. <br /> <br />S. <br /> <br />Project sponsor may Issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are Issued). <br /> <br />'. <br /> <br />6. Conduct a pre-construction conference. Approval of <br />co~struction schedule by Board staff. <br /> <br />7. <br /> <br />Co~struction commences. The Boatd staff makes petiodic <br />inspections during construction. All change ordets must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />'-'!:';'-iF" <br /> <br />, <br />,. <br />;". <br /> <br />8 . <br /> <br />The consulting <br />been completed <br />speelf Ications <br /> <br />,> . <br />!(, <br />, .""~, ' <br />i':......, <br />".. <br />~t,' <br />t ,",,',; <br /> <br />f'::-. <br />"'ii';"E'" <br /> <br /> <br /> <br /> <br /> <br />f"?;:" <br /> <br />~~Jj!~;; <br /> <br />I;......., <br />{:'S:'.' <br />/: <br /> <br />;;. <br /> <br />.,,: <br /> <br />engineer certifies that the project <br />according to approved drawings and <br />and arranges for final inspection. <br /> <br />has <br /> <br />( <br /> <br />9. <br /> <br />F I na 1 <br />Board <br /> <br />"'''. <br /> <br />inspection <br />s ta tf . <br /> <br />and acceptance of as-built project by <br /> <br />SUbmittal Of' as-built:"dr~i1I'\i9.~~to~RiU~gl!! <br />apptoval and filing. .. . <br /> <br />'.l <br /> <br /> <br /> <br />",::,:,-'-,. <br />.,":".. <br /> <br />EXHIBIT E <br /> <br />lSDDE <br /> <br />"'-'-;'.' <br /> <br />~,,-'-.:, <br /> <br />, ~i;iiiij)L:: :.;...~Jf.~lii;U/;::. <br /> <br />.',.', <br /> <br />J,i.~,~L:,;B.:;;",:3;:;:,su/;Lf!1@iii.Ej..: <br /> <br />'",",'" <br /> <br />.'" <br />..~:-L.;;} <br />