Laserfiche WebLink
<br />, <br /> <br />'.." <br /> <br />, ) <br /> <br />,.~: .,.' <br /> <br /> <br />~ <br /> <br />110ml~ <br />W/F <br />Cornall Ile <br />Peterson <br />Twin Lakes <br /> <br />. -...........TMI!NTOltAOENCVNAMB <br />)ater Conservation Bd. <br />Df.P^UMI!NTOR "OENCY NUMBER <br />PDA <br />ROlTfTNO NUMBER <br /> <br />AMENDMENT #. <br />FEASIBILITY <br />REPORT <br />CONTRACf <br /> <br />No additional encumbrance <br /> <br />nus roNl1tACT.1DIlda thII ~ daJ cl 199~ bJ eel belweea the State or Colondo for <br />lhe.-aDdbeael1taflbcDeputmeator Natural Resourc s <br />(Colorado Water Conservation Board) <br />berelDancrrefemldloa.lbeSlate.aDd the City of Greeley, <br />Greeley Civic Center, Greeley, CO 80631, <br />~r rd'amllo _the CIJGtnIdor/OxItrad.or. <br /> <br />WlIBRI!AS. .utbodlf csktIla. lhc Law aDd Fundi line beea bDdae1ed. .pproprlIIled and olhenrisc _de awllable aad . <br />aumdenl uneacumbcRd balance lheRd remalDs avaIIeble for p-pneDt Ia ('uad Number 462 . ApproprfatJoa 274 . <br />oopnlDtIoo YYYY .......... WTRC c..1nd_b_Number, C~153467 ,,,,,, <br /> <br />WlIBRIlAS. required appnMI. deuance and coordinatJoa hne bcctI lttOlllpUsbed from and wlib. approprbtc acelldcs; lUId <br /> <br />WHEREAS, a contract was entered irtto on July 1, 1986, Contract <br />Encumbrance Number C153467 (the Oriqinal Contract), between the <br />State and the Contractor; and <br /> <br />WHEREAS, the Oriqinal Contract provided that the state would <br />pay fifty percent (50%) of the cost for the Contractor to conduct <br />feasibility studies for the rehabilitation of three dams; namely, <br />Comanche Dam, Peterson Dam and Twin Lakes Dam. Fifty Percent (50%) <br />of that cost is'Sixty-Eiqht Thousand Five Hundred sixty Dollars <br />($68,560), as shown by Exhibit B of the Oriqinal Contract; and <br /> <br />WHEREAS, on February 17, 1988, an amendment to the oriqinal <br />Contract was entered into between the State and the Contractor <br />which removed Twenty-Six Thousand six Hundred Forty Dollars <br />($26,640), the proportionate share of the Comanche Dam feasibility <br />study only, from the oriqinal Sixty-Eiqht-Thousand-Five-Hundred- <br />Sixty-Dollar ($68,560) State appropriation for the three <br />feasibility studies; and <br /> <br />WHEREAS, on February 17, 1988, a Project Contract was entered <br />into between the State and the Contractor for the rehabilitation of <br />the Comanche Dam and the Twenty-Six-Thousand-Six-Hundred-Forty- <br />Dollar ($26,640) cost of the Comanche Dam feasibility stUdy was <br />added to that contract; and <br /> <br />WHEREAS, The Contractor now wishes to add Contract Amendment #2 <br />to the oriqinal Contract with the State which will remove an <br />additional Twenty-Three Thousand six Hundred Forty Dollars <br />($23,640), the proportionate share of the Peterson Dam feasibility <br />study only, from the Oriqinal Contract; and <br /> <br />WHEREAS, the Contractor now desires to enter into a Project <br />Contract with the State.to proceed with the rehabilitation of <br />Pet~rson Dam; and <br /> <br />WHEREAS, the Contractor wishes to add the Twenty-Three Thousand <br />six Hundred Forty Dollars ($23,640) deleted from the oriqinal <br />Contract to the repayment schedule for the proposed Peterson Dam <br />rehabilitation Project Contract; and . c . <br />.--/""'. <br />~ WHEREAS, pursuant to Senate Bill No. 15, Fifty-Sixth General <br />\ Assembly of the State of Colorado, duly enacted into law, the State <br />, has been authorized to enter into a Project Contract to loan a sum <br />\ not to exceed Three Hundred Eiqhty Thousand Dollars ($380,000) for <br />\ the rehabilitation of peterson Dam, which includes Twenty-Three <br />Thousand six Hundred Forty Dollars ($23,640) as the State~s share <br />of the feasibility report for Peter~on Dam, as shown in Exhibit B <br />of the Oriqinal Contract; and <br /> <br />\ /J <br />'/ <br /> <br />CWCll8f'Jl <br /> <br />rIte 1 or ~ pap <br />EXHIBIT B <br /> <br />bj291. k <br /> <br />drOO13.con <br />