|
<br />..--,
<br />l..
<br />
<br />(y
<br />V,.'
<br />
<br /> I Date: 16-Aug-94
<br />Final Design-Opinion of Costs
<br />Peterson Dam Reservoir
<br />No. Description Qty, Unit Unit Price Item Price
<br /> Bid Schedule A -
<br />1 Mobilization 1 LS $45,000,00 . $1~,OOO.2~
<br />2 Stream Diversion and Dewatering 1 lS $18,000.00 $18,000,00
<br />3 Stripping, Clearing, Razit\g Outlet 1 LS $20,000.00 $20,000.00
<br />4 Unclassified Earth Excavation 31,417 CY $1,00 $31,417,00
<br />5 General Earth Fill 2,000 , CY $2,50 $5,000.00
<br />6 Saddle Dam Embankment Fill 8,676 CY .$2,50 $21,695.1l0
<br />7 Earth Spoil; Hauling and Placement 31,417 CY $1,00 $31,417.00
<br />6 Riprap; Supply and place 2,779 CY $26.00 $72,254,00
<br />9 Rock Excavation for RCC Dam 3,214 CY $10.00 $32,140.00
<br />10 Foundation Preperation fOl' RCC Dam 1 LS $10,000.00 $10,000.00
<br />11 RCC; produced and placed 6,482 CY $55.00 $466,510,00
<br />12 Class 1 Concrete, spillway crest wall 1 LS $5,000.00 $5,000,00
<br />13 Class 1 Concrete, plunge pool 47 CY $200.00 $9,400,00
<br />14 Class 2 Concrete, dam fa<:e 25,600 SF $1.25 - $32,250.66
<br />15 Class 2 Concrete, dental at foundation 150 SY $75.00 $11,250.00
<br />16 Cement for all Concrete dasses 19,000 Cwt $4.45 $64,550.00
<br />17 Crack Control Joints in RCC Dam 350 VLF $25.00 $6,750,00
<br />18 Outlet Structur!!', gstetower ,... . , 1 LS $58,000,00 $56,000.00
<br />19 30. RCPOutlefPipe;cOncreteencase '. 1 LS $12,000.00 $12,000.00
<br />20 .'. 30. Sluice Gate.. . .... : 2 EA $12,000,00 $24,000,00
<br />21 Toe Drains .' . . ' '..
<br /> a. 6" POP . '. 618 LF $20.00 $12,360.00
<br /> b. 12 NPDP 150 LF $8.00 $1,200,00
<br />22 Toe Drain Manholes 1 LS $1,500,00 $1,500,00
<br />23 Toe Drain Weirs . 1 LS $l,022:!!0 $1,000.00
<br /> - . --_.. "' ..
<br />24 Parshall Flume 1 LS $2,000.00 $2.000,00
<br />25 Water Level Staff Gage I 1 LS $2,000,00 $2,000.00
<br />26 Road Gravel 300 SY $5,00 $(500.66
<br />27 Access Trail and Bridge , 1 LS $2,500.00 $2,500.00
<br />28 Fencing 50 LF $100.00 $5,000,00
<br />29 Erosion Control Seeding 1 LS . $6,500,00 $6,500,00
<br />30 Piezometer 1 LS $3,000,00 $3,000.00
<br />31 Movement Devices and Monuments 5 EA ,. $500,00 $2,500.00
<br /> ----
<br /> Subtotal $1,039,693.00
<br />
<br />Page 1
<br />
|