My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00547
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/6/2006 12:01:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153488
Contractor Name
Sedgwick-Sand Draws Watershed Conservancy District
Contract Type
Loan
Water District
64
County
Sedgwick
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(c <br /> <br />. <br />EXIIIBIT B <br /> <br />(,...; <br /> <br />SCIIEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION ~UND PROGR~~ PROCEDURES <br /> <br />1. <br /> <br />Board approval of" engineer-ing firm and engineering <br />agreement between engineering finn and project sponsor. <br /> <br />preparation of detail~d plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />2. <br /> <br />3. <br /> <br />Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />4. <br /> <br />Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br />I~.q.-;-~ <br />. ~'~,~ <br />Project sponsor may issue the notice:{of 'i3.'.J'~ and the <br />notice to proceed with construction~~6>>..the ~ ntractor <br />(both notices must be approved b~ithe "B~iEd tafE before <br />they are issued).. /;'~i\) ~\';;.~~ <br />"".,,", ~~, <br />. 'X"'l::>.. l <br />Conduct a pre-construction conferenB~~~pproval of <br />construction schedule by BO~~.\,staff. 1" <br /> <br />Construction commences. ~he \~~~~i~' aff makes oeriodic <br />inspections during con.".t:"i'. r.,iJti~tio~;cd'l~' change orders must <br />be approved by the Boa'~d 'Shiff advance and before any <br />construction on Chan<i'~:":t't.~,/I{.s s ca commenCe. Emergency <br />items cleared by teleph6ri~ <br /> <br />The consulting engineer ce lfles that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection.. \ <br /> <br />Final inspection and acceptance of as-built project by <br />Board staff. ' <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />6. <br /> <br />9. <br /> <br />10. <br /> <br />Submittal of as-built drawings to 80ard staff for <br />approval and ffl ing . <br /> <br />. <br /> <br />EXIIIIHT IJ <br /> <br />102 <br />schedl a <br /> <br />. <br /> <br />\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.