Laserfiche WebLink
<br />:':'/f1110.1\('.OIA <br /> <br /> <br />CONTRAcr <br /> <br />$354,113.57 <br /> <br /> <br />1981, by and between the <br />Resources <br /> <br />ists w and Funds have been budgeted. appropriated and otherwise made <br />balance thereor remains ava~kl: for~aYmcnt in Fund Number 4008 . <br />. Contruct Encumbrance NumberC ~33 ~ <br /> <br />S. required approval. clearance and coordination has been 'accomplished from and with appropriate <br /> <br />WHEREAS, pursuant to the provisions of section 37-60-119, <br />Colorado Revised Statutes 1973, as amended, the State is <br />authorized to construct certain water projects for the benefit <br />of the people of the State; and <br /> <br />WHEREAS, the Contractor is a duly constituted town in the <br />State of Colorado and wishes to improve its existing water <br />supply system,. hereinafter called the project, for the citizens <br />of the Town of Basalt in Eagle County, Colorado, at an <br />estimated cost of approximately Three Hundred Fifty-Five <br />Thousand Dollars ($355,000); and <br /> <br />WHEREAS, a feasibility investigation of said project was <br />conducted and it was found that such a project is economically <br />feasible; and <br /> <br />WHEREAS, the State has agreed to construct said project and <br />to sell the same to the Contractor upon mutually agreeable <br />terms and conditions, subject to the availability of funding <br />for that purpose; and <br /> <br />WHEREAS, pursuant to Senate Bill No. 69, Fifty-First <br />General Assembly of the State of Colorado, duly enacted into <br />law, the Colorado Water Conservation Board has been authorized <br />to expend a sum not to exceed six Hundred Thousand Dollars <br />($600,000) for construction of the project; and <br /> <br />WHEREAS, the Contractor has already incurred Three Hundred <br />Fifty-Four Thousand One Hundred Thirteen Dollars and <br />Fifty-Seven Cents ($354,113.57) of expenses on prior portions <br />of the project, which expenses have been documented by the <br />Contractor to the State's satisfaction. <br /> <br />NOW TH~REFORE, in consideration of the mutual and <br />dependent covenants herein contained, it is agreed by the <br />parties hereto as follows: <br /> <br />A. The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm to prepare project plans <br />and specifications for the proposed project. Both the <br />engineering firm and the pr.oject plans and specifications shall <br />be approved by the State. <br /> <br />2. Subcontract the construction of said project to a <br />responsible and capable firm, said project to be completed <br />within two (2) years of the date of this contract in acco~dance <br />with the project plans and specifications and any necessary <br /> <br />395-53-o1-C010 <br /> <br />Page I of -1- pages <br />"(SI.'e i'ISlruclion$ on rwClI;l,l or bll page. I <br />