My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00542
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/6/2006 12:00:51 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153394
Contractor Name
Wellington, Town of
Contract Type
Loan
Water District
1
County
Larimer
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SCHEDULE A <br /> <br />COLORAOO WATER CONSERVATION BOARD <br />CONSTRUCTIDN FUND PRDGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm dnd project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams dnd <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />4. Board staff approval of bidding for .the project. Board <br />staff present at bid opening for constructIon. <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are Issued). <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />Inspections during constructIon. All change orders must <br />be approved by the Board staff in advance and before an~ <br />construction on change items can commence: Emergenc~ <br />items cleared by telephone. <br /> <br />8. The consulting engineer certIfies that the project has <br />been completed according to approved drawings and <br />specificatIons and ~rranges for fin~l inspection. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and.flllng. <br />
The URL can be used to link to this page
Your browser does not support the video tag.