My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00540
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/6/2006 12:00:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153697
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
FSL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />B3. <br /> <br />V-20 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS (Page 2) <br /> <br />CHAPTER <br /> <br />DESCRIPTION <br /> <br />PAGE <br /> <br />Part ~ - Detailed Evaluation of Feasible <br />Alternatives <br /> <br />Bl. <br />B2. <br /> <br />General <br />Detailed Evaluation of Alternative 1 <br />(Domestic Water Pipeline from Gurley <br />Reservoir) , <br />Detailed Evaluation Of Alternative 2 <br />(New Reservoir for winter Storage) <br />. . I . <br />Deta~led Evaluat~on Of Alternat~ve 5 <br />(Pump station & Pipe Line Using San <br />Miguel River Water) <br />Comparison of Reservoir and Pipeline <br />Alternatives <br /> <br />V-14 <br />V-16 <br /> <br />B4. <br /> <br />B5. <br /> <br />V-29 <br />V-32 <br /> <br />Part g - Development of Supplemental Sources of Water <br /> <br />VI <br /> <br />Cl. Water Wells <br />C2. Optimize Use of Existing Water Rights <br /> <br />DESCRIPTION OF SELECTED ALTERNATIVE <br /> <br />V-38 <br />V-38 <br /> <br />A. Project Operation <br />B. Description of Proposed Reservoir site <br />C. Description of Proposed Reservoir <br /> <br />VI-l <br />VI-5 <br />VI-6 <br /> <br />VII <br /> <br />FINANCIAL PLAN <br /> <br />A. Cost Estimate <br />B. Expenditures <br />C. Repayment Schedule <br /> <br />VII-l <br />VII-l <br />VII-3 <br /> <br />APPENDIX <br />
The URL can be used to link to this page
Your browser does not support the video tag.